The Related Companies has won wage-cutting agreements with four dozen construction unions in its efforts to save money on the $15 billion development of Hudson Yards. The developer got the groups to agree to cut wages and benefit packages by 10% to ensure they would be commissioned to work on the project, expected to go on for a decade. About 13 million sf of construction is planned for the 26-acre site, which would account for about 39 million hours of work.
Click here to read more. +
Related Stories
Codes and Standards | May 15, 2018
Blast testing of loaded mass timber structures yields positive results
Four tests covered a spectrum of blast loads.
Codes and Standards | May 14, 2018
Maryland makes general contractors liable for failure of subs to pay employees
GCs could have to pay for up to three times the wages owed.
Codes and Standards | May 10, 2018
Data collection, machine learning boost building efficiency
Sensors, software algorithms squeeze out waste.
Codes and Standards | May 9, 2018
OSHA and state safety agencies write more than 100 silica citations in 6 months
Actions tending to come with investigation of other site conditions.
Codes and Standards | May 8, 2018
Powerhouse coalition builds energy positive buildings
The goal: build buildings that provide more power than they cost to build, run, and demolish.
Codes and Standards | May 7, 2018
Plan advances in Los Angeles for Climate Emergency Mobilization Department
Would oversee efforts to reduce greenhouse gas emissions across the city.
Codes and Standards | May 3, 2018
Data collection, machine learning boost building efficiency
Sensors, software algorithms squeeze out waste.
Codes and Standards | May 2, 2018
Energy Department releases Updated EnergyPlus and OpenStudio building energy modeling tools
The tools can now accept input in epJSON format.
Codes and Standards | May 1, 2018
ASHRAE publishes new energy simulation-aided design standard
Requires building energy modeling during schematic design.
Codes and Standards | Apr 30, 2018
CALGreen projects pre-approved for streamlined LEED v4 requirements
Reduces need to run additional energy models.