flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Registration open for Solar Power International 2012 in Orlando

Registration open for Solar Power International 2012 in Orlando

President Bill Clinton to deliver keynote address at ?largest solar energy event in the Americas.


By By BD+C Staff | April 20, 2012

The solar energy industry will come together Sept. 10–13 when Solar Power International 2012 (SPI '12) opens in Orlando Fla.Taking place at the Orange County Convention Center, SPI ’12 is a business-to-business global solar conference and expo for professionals in solar energy and related fields. ?

Presented by the Solar Energy Industries Association and the Solar Electric Power Association, SPI '12 features over 1,200 international and U.S. exhibitors and is expected to bring more than 21,000 attendees from 125 countries. President Bill Clinton will deliver a keynote address on Wednesday, Sept. 12.

In addition, SPI '12 offers a comprehensive conference program with approximately 40 sessions in six tracks: Finance, Markets, Policy, Technology, Grid and Transmission Planning, and In the Field. Topics include: new financing projects, policy initiative and changes that affect solar, avenues of opportunity in new markets, and technologies beyond PV and CSP, such as micro-inverters, central inverters and power optimizers.

SPI’s pre-conference workshop program is scheduled for Sunday and Monday, while a post-conference workshop will be held on Friday, offering in-depth classes. Back by popular demand, Solar Idea Swaps, one hour sessions facilitated by industry experts, return to SPI on Tuesday and Wednesday. These are excellent opportunities to engage in lively group discussions.

For program updates and to register visit www.solarpowerinternational.com. BD+C

Related Stories

| Aug 11, 2010

'Flexible' building designed to physically respond to the environment

The ecoFLEX project, designed by a team from Shepley Bulfinch, has won a prestigious 2009 Unbuilt Architecture Design Award from the Boston Society of Architects. EcoFLEX features heat-sensitive assemblies composed of a series of bi-material strips. The assemblies’ form modulate with the temperature to create varying levels of shading and wind shielding, flexing when heated to block sunlight and contracting when cooled to allow breezes to pass through the screen.

| Aug 11, 2010

New book provides energy efficiency guidance for hotels

Recommendations on achieving 30% energy savings over minimum code requirements are contained in the newly published Advanced Energy Design Guide for Highway Lodging.   The energy savings guidance for design of new hotels provides a first step toward achieving a net-zero-energy building.

| Aug 11, 2010

Perkins+Will master plans Vedanta University teaching hospital in India

Working together with the Anil Agarwal Foundation, Perkins+Will developed the master plan for the Medical Precinct of a new teaching hospital in a remote section of Puri, Orissa, India. The hospital is part of an ambitious plan to develop this rural area into a global center of education and healthcare that would be on par with Harvard, Stanford, and Oxford.

| Aug 11, 2010

Burt Hill, HOK top BD+C's ranking of the nation's 100 largest university design firms

A ranking of the Top 100 University Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

PBK, DLR Group among nation's largest K-12 school design firms, according to BD+C's Giants 300 report

A ranking of the Top 75 K-12 School Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Turner Building Cost Index dips nearly 4% in second quarter 2009

Turner Construction Company announced that the second quarter 2009 Turner Building Cost Index, which measures nonresidential building construction costs in the U.S., has decreased 3.35% from the first quarter 2009 and is 8.92% lower than its peak in the second quarter of 2008. The Turner Building Cost Index number for second quarter 2009 is 837.

boombox1
boombox2
native1

More In Category




Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â