The solar energy industry will come together Sept. 10–13 when Solar Power International 2012 (SPI '12) opens in Orlando Fla.Taking place at the Orange County Convention Center, SPI ’12 is a business-to-business global solar conference and expo for professionals in solar energy and related fields. ?
Presented by the Solar Energy Industries Association and the Solar Electric Power Association, SPI '12 features over 1,200 international and U.S. exhibitors and is expected to bring more than 21,000 attendees from 125 countries. President Bill Clinton will deliver a keynote address on Wednesday, Sept. 12.
In addition, SPI '12 offers a comprehensive conference program with approximately 40 sessions in six tracks: Finance, Markets, Policy, Technology, Grid and Transmission Planning, and In the Field. Topics include: new financing projects, policy initiative and changes that affect solar, avenues of opportunity in new markets, and technologies beyond PV and CSP, such as micro-inverters, central inverters and power optimizers.
SPI’s pre-conference workshop program is scheduled for Sunday and Monday, while a post-conference workshop will be held on Friday, offering in-depth classes. Back by popular demand, Solar Idea Swaps, one hour sessions facilitated by industry experts, return to SPI on Tuesday and Wednesday. These are excellent opportunities to engage in lively group discussions.
For program updates and to register visit www.solarpowerinternational.com. BD+C
Related Stories
| Feb 28, 2012
More than 1,000 have earned EDAC certification since 2009
Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.
| Feb 28, 2012
McCarthy completes second phase of San Diego’s Scripps Hospital
Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space.
| Feb 28, 2012
LUMEnergi names Weinbaum president and CEO
Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.
| Feb 28, 2012
Griffin Electric completes Medical University of South Carolina project
The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.
| Feb 27, 2012
Consigli complete first building for Bigelow Ocean Sciences Campus
Designed by WBRC Architects Engineers in association with Perkins + Will.
| Feb 27, 2012
Hollister completes fit-out of 41,500-sf office space in Princeton, N.J.
Intricate interior project involved construction of more than 80 offices.
| Feb 27, 2012
Research Institute at Texas Children’s Hospital building receives LEED Gold
Innovative and sustainable design reflects best environmental building practices.
| Feb 26, 2012
Milwaukee U-Haul facility receives LEED-CI Silver
The new elements of the facility now include: efficient lighting with day-lighting controls and occupancy sensors, a high-efficiency HVAC system used in conjunction with a newly constructed thermal envelope to help reduce energy consumption, and the installation of low-flow fixtures to reduce water consumption.
| Feb 26, 2012
Hollister Construction awarded 42,000-sf office fit-out in Holtsville, N.Y.
Space leased by U.S. General Service Administration.