flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Register today for BD+C’s June 8th webinar on restoration and reconstruction projects

Register today for BD+C’s June 8th webinar on restoration and reconstruction projects


May 25, 2011

Based on new and award-winning building projects, this webinar presents our “expert faculty” to examine the key issues affecting project owners, designers and contractors in case studies ranging from gut renovations and adaptive reuses to restorations and retrofits.

Nuts-and-bolts issues are discussed, including:

How to assess an existing building for reconstruction options

The recladding and reroofing of existing structures

Energy-efficiency retrofits; structural upgrades

Ways to promote green building and LEED certification

The case studies and faculty presenters are all current winners of the 27th Annual Reconstruction Awards, a program presented in 2010 by Building Design+Construction magazine. Their project types include institutional campuses, downtown commercial developments and freestanding industrial facilities, with budgets of $9 million to $30 million and up.

Speaker:

Jean Carroon, FAIA, LEED AP, is a principal in Goody Clancy’s highly regarded preservation practice and the author of Sustainable Preservation: Greening Existing Buildings. She has earned national recognition for her expertise in applying sustainable-design technology to historic buildings.

Reconstruction Awards Webinar: Advice from the Award Winners

Wednesday, June 8, 2011

1:00pm - 2:00pm ET

Register today

Related Stories

Airports | Oct 5, 2015

Perkins+Will selected to design Istanbul’s 'Airport City'

The mixed-use development will be adjacent to the Istanbul New Airport, which is currently under construction.

High-rise Construction | Oct 5, 2015

Zaha Hadid designs cylindrical office building with world’s tallest atrium

The 200-meter-high open space will cut the building in two.

Architects | Oct 2, 2015

Herzog & de Meuron unveils design for Vancouver Art Gallery expansion

The blocky, seven-story wood and concrete structure is wider in the middle and uppermost floors.  

Airports | Sep 30, 2015

Takeoff! 5 ways high-flyin' airports are designing for rapid growth

Nimble designs, and technology that humanizes the passenger experience, are letting airports concentrate on providing service and generating revenue.

Contractors | Sep 30, 2015

FMI: Construction in place on track for sustained growth through 2016

FMI’s latest report singles out manufacturing, lodging, and office sectors as the drivers of nonresidential building activity and investment.

Reconstruction & Renovation | Sep 29, 2015

What went wrong? Diagnosing building envelope distress [AIA course]

With so many diverse components contributing to building envelope assemblies, it can be challenging to determine which of these myriad elements was the likely cause of a failure.

Architects | Sep 24, 2015

Supertall buildings vie for dominance along Chicago’s skyline

The latest proposals pit designs by Rafael Viñoly, Jeanne Gang, and Helmut Jahn.

Architects | Sep 24, 2015

From Gehry to the High Line: What makes a project a game-changer?

Each year, there are a handful of projects that significantly advance the AEC industry or a particular building type. Send us your game-changing projects for BD+C’s January 2016 special report.

Cultural Facilities | Sep 24, 2015

Bakpak Architects' 'pottery courtyard' concept in Poland incorporates local heritage

The multifunctional building proposed for Rzeszow, Poland, looks like it was handcrafted on a potter’s wheel.

Modular Building | Sep 23, 2015

SOM and DOE unveil 3D-printed, off-the-grid building

The Additive Manufacturing Integrated Energy (AMIE) building features a high-performance shell with a photovoltaic roof and built-in natural gas generator.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021