flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Rediscovered Mies van der Rohe design under construction at Indiana University

University Buildings

Rediscovered Mies van der Rohe design under construction at Indiana University

The design was originally created in 1952.


By David Malone, Associate Editor | June 21, 2021
Mies Building for the Eskenazi School of Art, Architecture + Design exterior under construction
Mies Building for the Eskenazi School of Art, Architecture + Design exterior under construction

A new shared facility for Indiana University’s Eskenazi School of Art, Architecture + Design is currently under construction on the Bloomington campus. The facility is being built from a rediscovered Mies van der Rohe design originally created in 1952.

The 10,000-sf, two-story building was adapted for contemporary use by Thomas Phifer and Partners and will sit at the center of the Bloomington campus. The Mies Building for the Eskenazi School of Art, Architecture + Design will be a 60-foot-wide, 140-foot-long rectangular structure with thin white-painted steel and expansive glass panes measuring 10 sf.

 

Mies Building for the Eskenazi School of Art, Architecture + Design exterior during construction

 

Floor-to-ceiling windows will wrap the entire second story to provide the impression of transparency throughout the building. The second floor will also feature a central exterior square atrium. Much of the lower level is open to the air, with the second, main story elevated above the ground plane.

 

SEE ALSO: The Scott A. McGregor Computer Science Center completes on Harvey Mudd College’s campus

 

The building design has a strong relationship with Mies van der Rohe’s Farnsworth House and the massing and form of many of his early concepts for building at the Illinois Institute of Technology.

The facility is scheduled to open in fall 2021.

 

Mies Building for the Eskenazi School of Art, Architecture + Design exterior central courtyard

Related Stories

Green | Apr 21, 2023

Top 10 green building projects for 2023

The Harvard University Science and Engineering Complex in Boston and the Westwood Hills Nature Center in St. Louis are among the AIA COTE Top Ten Awards honorees for 2023. 

Higher Education | Apr 13, 2023

Higher education construction costs for 2023

Fresh data from Gordian breaks down the average cost per square foot for a two-story college classroom building across 10 U.S. cities.

Market Data | Apr 11, 2023

Construction crane count reaches all-time high in Q1 2023

Toronto, Seattle, Los Angeles, and Denver top the list of U.S/Canadian cities with the greatest number of fixed cranes on construction sites, according to Rider Levett Bucknall's RLB Crane Index for North America for Q1 2023.

University Buildings | Apr 11, 2023

Supersizing higher education: Tracking the rise of mega buildings on university campuses

Mega buildings on higher education campuses aren’t unusual. But what has been different lately is the sheer number of supersized projects that have been in the works over the last 12–15 months.

Contractors | Apr 10, 2023

What makes prefabrication work? Factors every construction project should consider

There are many factors requiring careful consideration when determining whether a project is a good fit for prefabrication. JE Dunn’s Brian Burkett breaks down the most important considerations. 

Smart Buildings | Apr 7, 2023

Carnegie Mellon University's research on advanced building sensors provokes heated controversy

A research project to test next-generation building sensors at Carnegie Mellon University provoked intense debate over the privacy implications of widespread deployment of the devices in a new 90,000-sf building. The light-switch-size devices, capable of measuring 12 types of data including motion and sound, were mounted in more than 300 locations throughout the building.

Architects | Apr 6, 2023

New tool from Perkins&Will will make public health data more accessible to designers and architects

Called PRECEDE, the dashboard is an open-source tool developed by Perkins&Will that draws on federal data to identify and assess community health priorities within the U.S. by location. The firm was recently awarded a $30,000 ASID Foundation Grant to enhance the tool. 

Architects | Apr 6, 2023

Design for belonging: An introduction to inclusive design

The foundation of modern, formalized inclusive design can be traced back to the Americans with Disabilities Act (ADA) in 1990. The movement has developed beyond the simple rules outlined by ADA regulations resulting in features like mothers’ rooms, prayer rooms, and inclusive restrooms.

Sports and Recreational Facilities | Mar 30, 2023

New University of St. Thomas sports arena will support school's move to Division I athletics

The University of St. Thomas in Saint Paul, Minn., last year became the first Division III institution in the modern NCAA to transition directly to Division I. Plans for a new multipurpose sports arena on campus will support that move.

Designers | Mar 28, 2023

Inclusive design requires relearning how we read space

Pulling from his experience during a campus design workshop, David Johnson, AIA, LEED AP, encourages architects to better understand how to design spaces that are inclusive for everyone.

boombox1
boombox2
native1

More In Category




Student Housing

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021