flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Rediscovered Mies van der Rohe design under construction at Indiana University

University Buildings

Rediscovered Mies van der Rohe design under construction at Indiana University

The design was originally created in 1952.


By David Malone, Associate Editor | June 21, 2021
Mies Building for the Eskenazi School of Art, Architecture + Design exterior under construction
Mies Building for the Eskenazi School of Art, Architecture + Design exterior under construction

A new shared facility for Indiana University’s Eskenazi School of Art, Architecture + Design is currently under construction on the Bloomington campus. The facility is being built from a rediscovered Mies van der Rohe design originally created in 1952.

The 10,000-sf, two-story building was adapted for contemporary use by Thomas Phifer and Partners and will sit at the center of the Bloomington campus. The Mies Building for the Eskenazi School of Art, Architecture + Design will be a 60-foot-wide, 140-foot-long rectangular structure with thin white-painted steel and expansive glass panes measuring 10 sf.

 

Mies Building for the Eskenazi School of Art, Architecture + Design exterior during construction

 

Floor-to-ceiling windows will wrap the entire second story to provide the impression of transparency throughout the building. The second floor will also feature a central exterior square atrium. Much of the lower level is open to the air, with the second, main story elevated above the ground plane.

 

SEE ALSO: The Scott A. McGregor Computer Science Center completes on Harvey Mudd College’s campus

 

The building design has a strong relationship with Mies van der Rohe’s Farnsworth House and the massing and form of many of his early concepts for building at the Illinois Institute of Technology.

The facility is scheduled to open in fall 2021.

 

Mies Building for the Eskenazi School of Art, Architecture + Design exterior central courtyard

Related Stories

Education Facilities | Jan 8, 2018

Three former school buildings are repurposed to create mini-campus for teacher education

The $25.3 million project is currently under construction on the Winona State University campus.

Healthcare Facilities | Jan 6, 2018

A new precision dental center embodies Columbia University’s latest direction for oral medicine education

The facility, which nests at “the core” of the university’s Medical Center, relies heavily on technology and big data. 

Big Data | Jan 5, 2018

In the age of data-driven design, has POE’s time finally come?

At a time when research- and data-based methods are playing a larger role in architecture, there remains a surprisingly scant amount of post-occupancy research. But that’s starting to change.

Mixed-Use | Jan 5, 2018

USC Village is the largest development in the history of the University of Southern California

USC Village comprises six buildings and 1.25 million sf.

Adaptive Reuse | Jan 4, 2018

Student housing development on Chapman University campus includes adaptive reuse of 1918 packing house

The Packing House was originally built for the Santiago Orange Growers Association.

University Buildings | Dec 20, 2017

New residence hall to house 500 students at Duke University

The project was designed by William Rawn Architects and will be built by Skanska.

University Buildings | Dec 4, 2017

The University of Nebraska’s new College of Business building highlights entrepreneur alumni and corporate leaders

Numerous storytelling spaces and displays are located throughout the building.

Wood | Nov 30, 2017

The first large-scale mass timber residence hall in the U.S. is under construction at the University of Arkansas

Leers Weinzapfel Associates, Modus Studio, Mackey Mitchell Architects, and OLIN collaborated on the design.

University Buildings | Nov 28, 2017

FXFOWLE and CO Architects collaborate on Columbia University School of Nursing building

The building has a ‘collaboration ribbon’ that runs throughout the building.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021