flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Red tape ruined the U.K.’s home retrofit program

Codes and Standards

Red tape ruined the U.K.’s home retrofit program

Lessons learned could help US avoid that fate.


By Peter Fabris, Contributing Editor | April 7, 2021

Courtesy Pixabay

Bureaucratic ineptitude ruined the U.K.’s disastrous home retrofit program, and the U.S. could draw valuable lessons from the debacle.

Last summer the U.K. unveiled a “build back better” economic stimulus package that was centered around a $2 billion program to retrofit homes. The program was supposed to fund energy efficiency and clean heat upgrades in 600,000 homes, but it was canceled recently after a six-month effort that may have killed more jobs than it created.

The Green Homes Grants program allowed most U.K. homeowners and landlords to receive up to about $6,900 to help pay for insulation, electric heating systems, and other energy-efficient upgrades such as new windows, doors, and heating controls. Low-income homeowners were eligible for up to nearly $14,000.

But, in order to apply, building owners had to obtain a quote from an accredited installer—few of which existed. Installers were reluctant to go through the time-consuming and expensive process of getting accredited without a longer-term assurance that there would be work. Program administrators often rejected quotes for being too high, asking applicants to provide more details or seek out additional estimates. Many homeowners dropped their retrofit plans as a result.

Retrofitting homes is a major part of the Biden Administration’s $2 trillion American Jobs Plan aimed at economic recovery from the COVID-19 recession. The administration can look across the Atlantic as a lesson on how to avoid failure.

Related Stories

Codes and Standards | Oct 5, 2016

New York becomes the first city to adopt a target for energy storage

Mayor de Blasio also announces increased solar generation goals

Codes and Standards | Oct 4, 2016

New global residential floor space measurement standard unveiled

The new standards will produce better transparency and are said to benefit investors.

Codes and Standards | Sep 29, 2016

Dept. of Energy forecasts big jump in LED use, resulting energy savings

Big gains are expected in both commercial and residential markets.

Codes and Standards | Sep 28, 2016

San Francisco commercial, multifamily regulations aim to reduce traffic volume

City planners will require design features to cut miles driven.

Codes and Standards | Sep 28, 2016

Society of Landscape Architects releases guide to resilient design

The goal is to retrofit communities to better withstand extreme weather events.

Codes and Standards | Sep 22, 2016

Construction firms pulling back from federal market due to new reporting rules

‘Subjective, very vague’ policies  are said to create too much risk.

Codes and Standards | Sep 21, 2016

Airbnb presents legal liability for multifamily owners

How building owners can reduce risks.

Codes and Standards | Sep 21, 2016

Healthy buildings becoming a key design priority for both architects and building owners

Nationwide survey finds nearly three of four architects cite health impacts influencing design decisions

Data Centers | Sep 19, 2016

New ANSI/ASHRAE data center standard is performance-based, more flexible

The aim of the standard was to ‘not stifle innovation.’

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021