flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Red tape delays California county jail construction projects

Red tape delays California county jail construction projects

Not a single county in the state has completed a jail project since 2007. 


September 5, 2013

California authorized $1.2 billion for jail construction in 2007, but not a single county in the state has completed a jail project since then. “The red tape is unbelievable,” says Manuel Perez, corrections director for Madera County. In the meantime, more prisoners are being sent to county jails after the U.S. Supreme Court ordered the state two years ago to reduce prison overcrowding.

(http://www.sacbee.com/2013/08/30/5693654/years-after-california-okd-12.html)

Related Stories

Codes and Standards | Jun 15, 2021

Growing housing supply gap will worsen affordability crisis

Supply projected to fall 4.5 million units short in 2022.

Codes and Standards | Jun 10, 2021

New York City cracks down on construction site safety

Buildings Dept. issues new safety legislation for City Council consideration.

Codes and Standards | Jun 9, 2021

ASHRAE updates health care facility ventilation standard

Includes improved guidance on thermal comfort, revisions to air filtration requirements.

Codes and Standards | Jun 8, 2021

American Wood Council releases new fire design specification

For design of wood members, assemblies, and connections to meet code requirements.

Codes and Standards | Jun 7, 2021

Guide provides strategies to overcome barriers to sustainable affordable housing

International Living Future Institute document helps with social, regulatory, and financial hurdles.

Codes and Standards | Jun 3, 2021

Conversion of large office buildings to residential will require revamped regulations

Post-1960 offices present ventilation, daylighting, and other challenges.

Codes and Standards | Jun 2, 2021

Dept. of Energy releases EnergyPlus and OpenStudio updates

New features include Python Plugin features and additional tabular reporting options.

Codes and Standards | Jun 1, 2021

Federal plan to double Canadian lumber tariffs draws intense criticism

Builders advised to stock up to deal with shortages.

Codes and Standards | Jun 1, 2021

Passive House standards proving their worth in multifamily sector

Energy performance beats conventionally built by 32% to 58%.

boombox1
boombox2
native1

More In Category


Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021