flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Red River College Polytechnic’s new Manitou a bi Bit daziigae opens

University Buildings

Red River College Polytechnic’s new Manitou a bi Bit daziigae opens

Diamond Schmitt and Number TEN Architectural Group designed the project.


By David Malone, Managing Editor | November 15, 2021
Manitou a bi Bii daziigae exterior
Images courtesy Diamond Schmitt

The Manitou a bi Bii daziigae at Red River College Polytechnic has officially opened on the university’s Winnipeg campus.

The project, formerly known as the Innovation Centre Project and designed by Diamond Schmitt and Number TEN Architectural Group in a joint venture, will bring together students with education and industry professionals in new ways that facilitate social innovation, enterprise, and innovative research.

The 10,000-sf facility unites a repurposed downtown concrete framed heritage building and a new construction to create an engaging crossroads in Winnipeg’s historic Exchange District. The building will house a combination of Indigenous and international student spaces, long distance teaching equipped classrooms, digital media labs and events spaces, and faculty offices.

Manitou a bi Bii daziigae skylight

The heart of Manitou a bi Bii daziigae is the agora. The agora is conceived as a place for campus-wide events as well as for group and quiet study. All programs overlook the agora while diagonal circulation invites its crossing and is supported by the collaboration areas that surround it. The sky-lit atrium above the agora blinds diffuse light to the center of the plan. A collaboration zone acts as a front porch between classrooms, the agora, and the atrium. The porch can be used by the classrooms, as a breakout room or project room, or independently booked by students for study groups.

The west corner of the new building is anchored by the 210-seat Roundhouse auditorium. The auditorium has a high degree of flexibility with an acoustically isolated space for ceremonial events, instruction, or celebration. At the roof level is the City Room, a beacon enveloped in a canvas of color representing traditional Indigenous teachings and local history.

Manitou a bi Bii daziigae circulation

The building’s facade is made of Kromatix Building Integrated Photovoltaic (BIPV) panels that change color depending on the angle of view and the weather. The facade, which is the first in Canada, conceals the solar cells behind nano-coated glass panels.

The facility’s name translates to where creator sits (Manitou a bi) and brings light (Bii daziigae).

Related Stories

Smart Buildings | Jan 7, 2014

9 mega redevelopments poised to transform the urban landscape

Slowed by the recession—and often by protracted negotiations—some big redevelopment plans are now moving ahead. Here’s a sampling of nine major mixed-use projects throughout the country. 

| Dec 13, 2013

Safe and sound: 10 solutions for fire and life safety

From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies. 

| Dec 10, 2013

16 great solutions for architects, engineers, and contractors

From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.

| Nov 27, 2013

Wonder walls: 13 choices for the building envelope

BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina. 

| Nov 26, 2013

Construction costs rise for 22nd straight month in November

Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.

| Nov 25, 2013

Building Teams need to help owners avoid 'operational stray'

"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.

| Nov 15, 2013

Greenbuild 2013 Report - BD+C Exclusive

The BD+C editorial team brings you this special report on the latest green building trends across nine key market sectors. 

| Nov 15, 2013

Metal makes its mark on interior spaces

Beyond its long-standing role as a preferred material for a building’s structure and roof, metal is making its mark on interior spaces as well. 

| Nov 13, 2013

Installed capacity of geothermal heat pumps to grow by 150% by 2020, says study

The worldwide installed capacity of GHP systems will reach 127.4 gigawatts-thermal over the next seven years, growth of nearly 150%, according to a recent report from Navigant Research.

| Oct 30, 2013

15 stellar historic preservation, adaptive reuse, and renovation projects

The winners of the 2013 Reconstruction Awards showcase the best work of distinguished Building Teams, encompassing historic preservation, adaptive reuse, and renovations and additions.

boombox1
boombox2
native1

More In Category




Student Housing

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021