flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Recycled recreation: Waste-to-energy plant combines with ski resort

Recycled recreation: Waste-to-energy plant combines with ski resort

Artificial snow will allow year-round use for this unique Danish landmark.


By BD+C Staff | March 5, 2013
A man-made mountain will conceal a waste-to-energy facility near Copenhagen.
A man-made mountain will conceal a waste-to-energy facility near Copenhagen.

 

A new project near Copenhagen pushes the boundaries of the term "mixed use," combining a waste-to-energy plant with a ski resort. The Amagerforbrænding Energy Plant, designed by Bjarke Ingels Group, will feature an incinerator wrapped in mesh, forming an artificial hill. BIG's theme of "hedonistic sustainability" suffuses this effort to turn an industrial facility into a tourist destination. The 95,000 sm facility will provide ample room for a ski slope featuring more than 1,500 m of runs, designed by German firms Topotek 1 and Man Made Land. Recycled synthetic granular material will be used instead of snow, facilitating year-round skiing. A smoke-ring generator will make use of water vapor emitted by the incinerator, creating an impressive display combined with lasers. Completion is projected for 2016.

(http://www.designbuild-network.com/projects/waste-to-energy/)

Related Stories

| Sep 28, 2011

Look who's coming to BD+C's Under-40 Leadership Summit

AEC industry "under-40 superstars" from top design and construction firms have signed up for BD+C's "Under-40 Leadership Summit."

| Sep 28, 2011

GBCI announces LEED fellow class of 2011

  LEED Fellows represent green building industry's most accomplished professionals.

| Sep 28, 2011

Bradley sponsors design studio on intelligent buildings for UWM SARUP

 The studio is taught by Gregory D. Thomson, assistant professor and co-director of the Institute for Ecological Design at UWM.

| Sep 23, 2011

Fire and hurricane rated glazed wall assemblies installed at multi-family residence in Florida

Fire and hurricane assemblies meet design and code requirements.

| Sep 23, 2011

ABI turns positive after four monthly declines

On the heels of a period of weakness in design activity, the Architecture Billings Index (ABI) took a sudden upturn in August.

| Sep 23, 2011

Under 40 Leadership Summit

Building Design+Construction’s Under 40 Leadership Summit takes place October 26-28, 2011 Hotel at the Monteleone in New Orleans. Discounted hotel rate deadline: October 2, 2011.  

boombox1
boombox2
native1

More In Category


Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021