flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Record storm surge in Boston prompts renewed calls for flood mitigation infrastructure

Codes and Standards

Record storm surge in Boston prompts renewed calls for flood mitigation infrastructure

Newer buildings constructed in flood zone fared well.


By Peter Fabris, Contributing Editor | January 18, 2018

A record storm surge caused by a recent winter storm produced significant flooding in downtown Boston and renewed calls for the construction of flood mitigation infrastructure.

Ocean water swamped areas near Boston Harbor and then froze solid. One flood mitigation proposal is a $10 billion sea barrier to be built in the harbor.

Mayor Martin J. Walsh linked the event to global warming, and warned developers to take the possibility of more flooding in the future into account when proposing projects near the waterfront. Recent projects in the city’s booming Seaport area did fare well during the storm, though.

Many were designed with mechanical systems on the roofs instead of basements, and some sites had had been landscaped to sit several feet above the natural ground level.

Related Stories

Resiliency | Mar 13, 2020

Feds push use of eminent domain to force people out of flood-prone homes

Local officials that don’t comply could lose federal money to combat climate change.

Codes and Standards | Mar 12, 2020

Design guide for sloped glazing and skylights updated for first time in 30 years

Helps with choosing proper glass for non-residential applications.

Codes and Standards | Mar 11, 2020

Two tree species native to the Northeast found suitable for CLT

Eastern white pine and eastern hemlock pass strength testing.

Codes and Standards | Mar 10, 2020

Prescient receives ICC certification for seismic resilience system

Technology suitable for buildings up to 12 stories in earthquake-prone areas.

Codes and Standards | Mar 6, 2020

Design firms creating plans to re-imagine D.C.’s tidal basin

Area including National Mall is facing increased flood risk.

Codes and Standards | Feb 28, 2020

Bay Area communities struggle with what to do about rising sea level

Policies include sea walls, levies, and relocation.

Codes and Standards | Feb 27, 2020

Cell phones present a safety hazard at job sites

Use of ear buds, headphones banned by some contractors.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021