flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Record storm surge in Boston prompts renewed calls for flood mitigation infrastructure

Codes and Standards

Record storm surge in Boston prompts renewed calls for flood mitigation infrastructure

Newer buildings constructed in flood zone fared well.


By Peter Fabris, Contributing Editor | January 18, 2018

A record storm surge caused by a recent winter storm produced significant flooding in downtown Boston and renewed calls for the construction of flood mitigation infrastructure.

Ocean water swamped areas near Boston Harbor and then froze solid. One flood mitigation proposal is a $10 billion sea barrier to be built in the harbor.

Mayor Martin J. Walsh linked the event to global warming, and warned developers to take the possibility of more flooding in the future into account when proposing projects near the waterfront. Recent projects in the city’s booming Seaport area did fare well during the storm, though.

Many were designed with mechanical systems on the roofs instead of basements, and some sites had had been landscaped to sit several feet above the natural ground level.

Related Stories

Codes and Standards | Jun 29, 2021

Biden China policy may spur more increased U.S. PV manufacturing capacity

Senate bill proposes advanced solar manufacturing production credit.

Codes and Standards | Jun 28, 2021

Local and state building energy performance standards aim to curb climate change

Owners must up the ante on operations and retrofits.

Codes and Standards | Jun 24, 2021

Biden Administration will restore ‘Waters of the U.S.’ protections ended by Trump

Early revision more likely to hold up in court, says legal expert.

Codes and Standards | Jun 23, 2021

Denver unveils renewable heating and cooling plan

City releases roadmap to decarbonizing existing homes and buildings.

Codes and Standards | Jun 22, 2021

Actually, few companies plan to significantly reduce their office footprint

CBRE survey shows that many firms will continue with hybrid work.

Codes and Standards | Jun 21, 2021

Vancouver, B.C., may delay new zero emissions building standards

Building permit delays may postpone new standards by a year.

Codes and Standards | Jun 17, 2021

Buffalo’s parking reform having noticeable impact on development

Elimination of mandatory parking allotments encourages new projects.

Codes and Standards | Jun 16, 2021

Inconsistent building codes make some states more vulnerable to hurricanes

Florida takes top spot for strongest building code in latest IBHS survey.

Codes and Standards | Jun 15, 2021

Growing housing supply gap will worsen affordability crisis

Supply projected to fall 4.5 million units short in 2022.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021