flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Reconstruction of Hall of Fame football stadium in Ohio moving forward

Sports and Recreational Facilities

Reconstruction of Hall of Fame football stadium in Ohio moving forward

The $80 million sports facility is among the features planned for a 90-acre mixed-use village.


By John Caulfield, Senior Editor | August 29, 2016

A new 23,000-seat football stadium will be a centerpiece within a retail/sports/entertainment/lifestyle village associated with the Pro Football Hall of Fame in Canton, Ohio.  Image: HKS

The steel structure for a new 23,000-seat football stadium that will be part of the $500 million, 90-acre Hall of Fame Village in Canton, Ohio, should be visible to travelers on Interstate 77 by next Christmas.

The old stadium’s north and south stands have been demolished, and the press box—which was built in 2009—will meet the wrecking ball next week, to be replaced by a larger area for media.

The new facility, called Tom Benson Hall of Fame Stadium and formerly known as Fawcett Stadium, is on schedule to be completed in time for next year’s Pro Football Hall of Fame enshrinement festival, although some elements won’t be completed until 2018. The stadium’s cost alone is projected to exceed $80 million.

Tom Benson, who owns the New Orleans Saints pro football team, has donated $11 million to the Hall of Fame, nearly all of it earmarked for the stadium reconstruction. The state is kicking in $10 million, and the city of Canton $5 million for the new stadium. The Canton City Schools owns the stadium, but will only be on the hook for its maintenance.

HKS’s Sports and Entertainment Group is the stadium’s designer, working with clients Industrial Realty Group and the Pro Football Hall of Fame.

The 76-year-old Fawcett Stadium has been a high school field. Its ticket booths are among the artifacts being preserved for future display within the Village.

This fall, construction begins on the Hall of Fame Village that will involve between 400 and 500 workers.

There are eight components to Hall of Fame Village, according to its website:

•The Pro Football Hall of Fame Museum

•Tom Benson Hall of Fame Stadium/Sports & Entertainment Complex, which will include a first-of-its-kind permanent stage that will be embedded into the stadium’s seating bowl and located at midfield. The field is being lowered by 12 feet to accommodate a fan plaza that connects to the Hall of Fame museum.

•A four-star Hotel & Conference Center

•Legends Landing/Residential (an assisted living facility, some of which could be housing for retired pro football players)

•A state-of-the-art Youth Sports Complex, which is already underway

•Center for Excellence (Coaches University; Academy of Corporate Excellence; Officiating Clinics; Safety, Health & Performance Center)

•Main Street Hall of Fame (restaurants, retail)

•Hall of Fame/NFL Family Experience (high-tech virtual reality experiences and rides)

An economic feasibility study indicates that Hall of Fame Village will create more than 13,000 new jobs, and over a 25-year period will generate $15.3 billion in net new total economic output within Stark County, Ohio.

Related Stories

| Dec 4, 2013

First look: Dubai's winning bid for World Expo 2020 [slideshow]

Dubai has been chosen as the site of the 2020 World Expo. HOK led the design team that developed the master plan for the Expo, which is expected to draw more than 25 million visitors from October 2020 through April 2021.

| Dec 3, 2013

Historic Daytona International Speedway undergoing $400 million facelift

The Daytona International Speedway is zooming ahead on the largest renovation in the Florida venue’s 54-year history. Improvements include five redesigned guest entrances, an extended grandstand with 101,000 new seats, and more than 60 new trackside suites for corporate entertaining.

| Nov 27, 2013

Wonder walls: 13 choices for the building envelope

BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina. 

| Nov 26, 2013

Video: Zaha Hadid's stadium for Qatar 2022 World Cup

Zaha Hadid Architects, in conjunction with AECOM, has released renderings for a major stadium being designed for the Qatar 2022 FIFA World Cup--an event that will involve up to nine stadiums.

| Nov 26, 2013

Construction costs rise for 22nd straight month in November

Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.

| Nov 25, 2013

Building Teams need to help owners avoid 'operational stray'

"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.

| Nov 19, 2013

Top 10 green building products for 2014

Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list. 

| Nov 13, 2013

Installed capacity of geothermal heat pumps to grow by 150% by 2020, says study

The worldwide installed capacity of GHP systems will reach 127.4 gigawatts-thermal over the next seven years, growth of nearly 150%, according to a recent report from Navigant Research.

| Nov 7, 2013

Fitness center design: What do higher-ed students want?

Campus fitness centers are taking their place alongside student centers, science centers, and libraries as hallmark components of a student-life experience. Here are some tips for identifying the ideal design features for your next higher-ed fitness center project. 

| Oct 30, 2013

11 hot BIM/VDC topics for 2013

If you like to geek out on building information modeling and virtual design and construction, you should enjoy this overview of the top BIM/VDC topics.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021