flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Reconstruction of Hall of Fame football stadium in Ohio moving forward

Sports and Recreational Facilities

Reconstruction of Hall of Fame football stadium in Ohio moving forward

The $80 million sports facility is among the features planned for a 90-acre mixed-use village.


By John Caulfield, Senior Editor | August 29, 2016

A new 23,000-seat football stadium will be a centerpiece within a retail/sports/entertainment/lifestyle village associated with the Pro Football Hall of Fame in Canton, Ohio.  Image: HKS

The steel structure for a new 23,000-seat football stadium that will be part of the $500 million, 90-acre Hall of Fame Village in Canton, Ohio, should be visible to travelers on Interstate 77 by next Christmas.

The old stadium’s north and south stands have been demolished, and the press box—which was built in 2009—will meet the wrecking ball next week, to be replaced by a larger area for media.

The new facility, called Tom Benson Hall of Fame Stadium and formerly known as Fawcett Stadium, is on schedule to be completed in time for next year’s Pro Football Hall of Fame enshrinement festival, although some elements won’t be completed until 2018. The stadium’s cost alone is projected to exceed $80 million.

Tom Benson, who owns the New Orleans Saints pro football team, has donated $11 million to the Hall of Fame, nearly all of it earmarked for the stadium reconstruction. The state is kicking in $10 million, and the city of Canton $5 million for the new stadium. The Canton City Schools owns the stadium, but will only be on the hook for its maintenance.

HKS’s Sports and Entertainment Group is the stadium’s designer, working with clients Industrial Realty Group and the Pro Football Hall of Fame.

The 76-year-old Fawcett Stadium has been a high school field. Its ticket booths are among the artifacts being preserved for future display within the Village.

This fall, construction begins on the Hall of Fame Village that will involve between 400 and 500 workers.

There are eight components to Hall of Fame Village, according to its website:

•The Pro Football Hall of Fame Museum

•Tom Benson Hall of Fame Stadium/Sports & Entertainment Complex, which will include a first-of-its-kind permanent stage that will be embedded into the stadium’s seating bowl and located at midfield. The field is being lowered by 12 feet to accommodate a fan plaza that connects to the Hall of Fame museum.

•A four-star Hotel & Conference Center

•Legends Landing/Residential (an assisted living facility, some of which could be housing for retired pro football players)

•A state-of-the-art Youth Sports Complex, which is already underway

•Center for Excellence (Coaches University; Academy of Corporate Excellence; Officiating Clinics; Safety, Health & Performance Center)

•Main Street Hall of Fame (restaurants, retail)

•Hall of Fame/NFL Family Experience (high-tech virtual reality experiences and rides)

An economic feasibility study indicates that Hall of Fame Village will create more than 13,000 new jobs, and over a 25-year period will generate $15.3 billion in net new total economic output within Stark County, Ohio.

Related Stories

Sports and Recreational Facilities | Nov 29, 2016

HKS-designed L.A. Stadium breaks ground

The stadium will be home to the L.A. Rams and will also host other world-class sporting events and college championships.

Sports and Recreational Facilities | Nov 14, 2016

Soccer stadium from Zaha Hadid Architects will be constructed almost entirely of wood

The architects say the project will be the greenest soccer stadium in the world once completed.

Sports and Recreational Facilities | Oct 13, 2016

Ice in the desert: The practice facility for the NHL expansion team in Las Vegas hopes to engage the local community

“This design is all about drawing the community into the excitement of NHL hockey,” says Arnie Martinez, AIA, Director of Architecture for Leo A Daly.

Sports and Recreational Facilities | Oct 12, 2016

A wood-clad arena is rising in Copenhagen

The design of this 377,000-sf building makes concessions to the residential community that surrounds it.

Sports and Recreational Facilities | Sep 26, 2016

Julian B. Lane Riverfront Park in Tampa to undergo Skanska-led $35.6 million reconstruction project

The park will serve as an urban oasis of outdoor activities for the surrounding area.

Sports and Recreational Facilities | Sep 26, 2016

Mercedes-Benz Stadium in Atlanta will be the NFL’s first LEED Platinum stadium

The Atlanta Falcons new home is expected to save 40% in energy usage than a typical NFL stadium.

Sponsored | Reconstruction & Renovation | Sep 13, 2016

Daytona International Speedway becomes racing’s first modern stadium

Daytona International Speedway has undergone a $400 million full-scale makeover to update the facilities first built in 1959.

Sports and Recreational Facilities | Sep 1, 2016

U.S. Open stadium’s new retractable roof showcases innovative problem solving in its design and engineering

Mushy ground and indoor condensation were just two of the issues this $150 million project presented to its Building Team. 

Sports and Recreational Facilities | Aug 22, 2016

The Hills of Governors Island reach completion one year ahead of schedule

The man made hills are the latest attraction to open on the island that has been under development since 2006.

| Aug 15, 2016

SPORTS FACILITY GIANTS: New and renovated college sports venues - designed to serve students and the community

Schools are renovating existing structures or building new sports facilities that can serve the student body and surrounding community.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021