flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Raymond Clark joins HOK’s Chicago Practice as Management Principal

Raymond Clark joins HOK’s Chicago Practice as Management Principal


By HOK | May 14, 2013

HOK announced today that Raymond Clark, AIA, LEED AP, has joined its leadership team in Chicago as senior vice president and management principal.

Clark brings 35 years of experience in the architectural and engineering profession. Most recently, he served as managing director of Perkins+Will's Chicago office. He began his career at Skidmore, Owings & Merrill.

“Ray is a proven leader in the design profession with a focus on integrating architecture and engineering solutions to create high-performance buildings,” said Patrick MacLeamy, FAIA, LEED AP, HOK's chairman and chief executive officer. “He has deep roots in Chicago and will make a significant impact on our robust practice here.”

“We are committed to ensuring that HOK’s office is among the strongest design practices in Chicago,” says Clark. “I'm excited to work with an exceptionally talented team and such wonderful clients.”

Clark served as principal in charge for the 150-story Chicago Spire condominium tower, the CBS Media Tower and the 40-story One South Dearborn office building in Chicago; the 1.9 million-square-foot Merchant Square mixed-use development in London; the 31-story Bank of America Center in Charlotte, N.C.; and the King Abdullah Financial District in Riyadh, Saudi Arabia. He was senior project architect and technical coordinator for the 88-story Jin Mao Tower in Shanghai and for the 44-story Hotel Arts in Barcelona.

Clark is involved in many Chicago-area organizations including the Urban Land Institute, the Council on Tall Buildings and Urban Habitat, the Chicago Committee on High-Rise Buildings, the Chicago Central Area Committee and the American Institute of Architects. He holds a Master of Architecture degree and a Bachelor of Science in Architectural Studies from the University of Illinois at Urbana-Champaign.

HOK’s Chicago practice projects include the University of Chicago William Eckhardt Research Center in Chicago; Advocate Good Shepherd Hospital Modernization Project in Barrington, Ill.; the Chicago Development Board Treatment and Detention Facility in Rushville, Ill.; The Joyce Foundation Office Relocation in Chicago; JW Marriott Hotel in Indianapolis; and the Ohio State University Wexner Medical Center Expansion in Columbus, Ohio.

HOK is a global design, architecture, engineering and planning firm. Through a network of 24 offices worldwide, HOK provides design excellence and innovation to create places that enrich people's lives and help clients succeed. In 2012, for the third consecutive year, DesignIntelligence ranked HOK as the #1 role model for sustainable and high-performance design.

Related Stories

Building Tech | May 21, 2024

In a world first, load-bearing concrete walls built with a 3D printer

A Germany-based construction engineering company says it has constructed the world’s first load-bearing concrete walls built with a 3D printer. Züblin built a new warehouse from a single 3D print for Strabag Baumaschinentechnik International in Stuttgart, Germany using a Putzmeister 3D printer. 

MFPRO+ News | May 21, 2024

Baker Barrios Architects announces new leadership roles for multifamily, healthcare design

Baker Barrios Architects announced two new additions to its leadership: Chris Powers, RA, AIA, NCARB, EDAC, as Associate Principal and Director (Healthcare); and Mark Kluemper, AIA, NCARB, as Associate Principal and Technical Director (Multifamily).

MFPRO+ News | May 20, 2024

Florida condo market roiled by structural safety standards law

A Florida law enacted after the Surfside condo tower collapse is causing turmoil in the condominium market. The law, which requires buildings to meet certain structural safety standards, is forcing condo associations to assess hefty fees to make repairs on older properties. In some cases, the cost per unit runs into six figures.

Office Buildings | May 20, 2024

10 spaces that are no longer optional to create a great workplace

Amenities are no longer optional. The new role of the office is not only a place to get work done, but to provide a mix of work experiences for employees.

Mass Timber | May 17, 2024

Charlotte's new multifamily mid-rise will feature exposed mass timber

Construction recently kicked off for Oxbow, a multifamily community in Charlotte’s The Mill District. The $97.8 million project, consisting of 389 rental units and 14,300 sf of commercial space, sits on 4.3 acres that formerly housed four commercial buildings. The street-level retail is designed for boutiques, coffee shops, and other neighborhood services.

Construction Costs | May 16, 2024

New download: BD+C's May 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

K-12 Schools | May 15, 2024

A new Alabama high school supports hands-on, collaborative, and diverse learning

In Gulf Shores, a city on Alabama’s Gulf Coast, a new $137 million high school broke ground in late April and is expected to open in the fall of 2026. Designed by DLR Group and Goodwyn Mills Cawood, the 287,000-sf Gulf Shores High School will offer cutting-edge facilities and hands-on learning opportunities.

Adaptive Reuse | May 15, 2024

Modular adaptive reuse of parking structure grants future flexibility

The shift away from excessive parking requirements aligns with a broader movement, encouraging development of more sustainable and affordable housing.

Affordable Housing | May 14, 2024

Brooklyn's colorful new affordable housing project includes retail, public spaces

A new affordable housing development located in the fastest growing section of Brooklyn, N.Y., where over half the population lives below the poverty line, transformed a long vacant lot into a community asset. The Van Sinderen Plaza project consists of a newly constructed pair of seven-story buildings totaling 193,665 sf, including 130 affordable units.

K-12 Schools | May 13, 2024

S.M.A.R.T. campus combines 3 schools on one site

From the start of the design process for Santa Clara Unified School District’s new preK-12 campus, discussions moved beyond brick-and-mortar to focus on envisioning the future of education in Silicon Valley.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021