flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Ransom Everglades School’s new STEM facility to emphasize flexibility

Education Facilities

Ransom Everglades School’s new STEM facility to emphasize flexibility

Perkins+Will is designing the building.


By David Malone, Associate Editor | April 18, 2019

All renderings courtesy Perkins+Will

Ransom Everglades School’s new 45,000-sf, three-story STEM facility will be a flexible space with the ability to adapt to a variety of learning needs, according to new details released by Perkins+Will, the project’s architect. The STEM facility is part of the larger master plan for the school’s Coconut Grove campus.

The building will feature 10 classrooms with movable walls and furniture, maker and fabrication labs, an outdoor rooftop lab, rooftop solar panels, a multi-purpose conference room, and a 200 person auditorium. The facility will include laboratories for earth sciences, biology, chemistry, and physics.

 

Students working a lab space

 

“It will be flexible, adaptable, collaborative; a think-tank type space,” said Pat Bosch, Design Director for Perkins+Will’s Miami office, while speaking to Ransom Everglades parents at a preview for the new building. “This is not a static building.”

The collaboration will pour out of the building and spill into the surrounding landscape as well. The project will create new outdoor breakout areas adjacent to the STEM building and a new quad. This connection between indoor and outdoor learning spaces is an important aspect of the new facility, which is slated to be ready for occupancy by early 2020.

 

Ransom Everglades stem building exterior

 

Breakout space in ransom everglades stem building

Related Stories

| Jan 22, 2014

SOM-designed University Center uses 'sky quads,' stacked staircases to promote chance encounters

The New School's vertical campus in Manhattan houses multiple functions, including labs, design studios, a library, and student residences, in a 16-story building.  

| Jan 17, 2014

The Starchitect of Oz: New Gehry building in Sydney celebrates topping out

The Dr. Chau Chak Wing Building at the University of Technology, Sydney, will mark Frank Gehry's debut project in the Australian metro.

| Jan 15, 2014

Report: 32 U.S. buildings have been verified as net-zero energy performers

The New Buildings Institute's 2014 Getting to Zero Status report includes an interactive map detailing the net-zero energy buildings that have been verified by NBI. 

| Jan 13, 2014

Custom exterior fabricator A. Zahner unveils free façade design software for architects

The web-based tool uses the company's factory floor like "a massive rapid prototype machine,” allowing designers to manipulate designs on the fly based on cost and other factors, according to CEO/President Bill Zahner.

| Jan 13, 2014

AEC professionals weigh in on school security

An exclusive survey reveals that Building Teams are doing their part to make the nation’s schools safer in the aftermath of the Sandy Hook tragedy.

| Jan 11, 2014

Getting to net-zero energy with brick masonry construction [AIA course]

When targeting net-zero energy performance, AEC professionals are advised to tackle energy demand first. This AIA course covers brick masonry's role in reducing energy consumption in buildings. 

| Jan 10, 2014

What the states should do to prevent more school shootings

To tell the truth, I didn’t want to write about the terrible events of December 14, 2012, when 20 children and six adults were gunned down at Sandy Hook Elementary School in Newtown, Conn. I figured other media would provide ample coverage, and anything we did would look cheap or inappropriate. But two things turned me around.

| Jan 10, 2014

Special Report: K-12 school security in the wake of Sandy Hook

BD+C's exclusive five-part report on K-12 school security offers proven design advice, technology recommendations, and thoughtful commentary on how Building Teams can help school districts prevent, or at least mitigate, a Sandy Hook on their turf.

| Jan 9, 2014

How security in schools applies to other building types

Many of the principles and concepts described in our Special Report on K-12 security also apply to other building types and markets.

| Jan 9, 2014

16 recommendations on security technology to take to your K-12 clients

From facial recognition cameras to IP-based door hardware, here are key technology-related considerations you should discuss with your school district clients.

boombox1
boombox2
native1

More In Category


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021