The city of Raleigh, N.C., is ready to break ground on the $387.5 million expansion of its Raleigh Convention Center that will add 300,000 sf to the facility, bringing its total to 800,000 sf.
Scheduled for completion in 2028, the expansion will include 80,000 sf of flexible event space and 30 meeting rooms. It will also be the new home for the Red Hat Amphitheater, which is moving one block south from its current location into a 6,000-person capacity space. Red Hat's new digs should be ready by 2026.
Also see: Metros seeking far bigger convention center spaces
Raleigh is building a 550-key hotel across the street from the convention center. The city is developing this one-acre property with Preston Hollow Community Capital and Provident Resources Group. The hotel will operate under the Omni Hotels & Resorts banner, and include 55,000 sf of meeting space, several food and beverage outlets, a rooftop pool, and spa, and fitness center. The hotel is scheduled to open in 2027.
A joint venture consisting of Skanska, Clancy & Theys, and D.A. Everett is managing the construction of the convention center expansion, which was designed by TVS and RATIO Design. Cumming Group and Cate Services are the owner’s reps on this project.
A record boost in convention-related visitors
Raleigh Convention Center and Red Hat Amphitheater are part of The Complex, a group of convention and entertainment venues that also includes Martin Marietta Center for the Performing Arts, and the Coastal Credit Union Music Part at Walnut Creek. Combined, these venues attract over 1.3 million visitors annually. Kerry Painter, The Complex’s Executive Manager, said in a prepared statement that the vision for the convention center expansion “is to create a space that can be something for everyone––welcoming, accessible, smart, and convenient.”
Chris Whitley, Jr., a vice president with Cumming Group, added that the expansion is addressing “the growing demand from our community for larger, more versatile event spaces.”
Last August, Wake County (N.C.) commissioners approved the funding for this project, using tax money from hotel stays and restaurant meals. Thirty-two million dollars of funding will pay for the relocation of Red Hat Amphitheater. Another $75 million in funding will go toward the hotel’s construction.
TVS, which is based in Atlanta, designed the existing convention center, and Skanska completed its construction in 2008. The convention center includes a 150,000-sf exhibit hall, 20 meeting rooms totaling 30,000 sf, and a 32,000-sf grand ballroom that can seat 2,400.
The city stated that it chose TVS and RATIO Design to design the expansion because of their international design experience, according to Exhibitor magazine’s website. Exhibitor also reported that fiscal 2023 was a record-breaking year for Raleigh Convention Center, which booked over 100,000 hotel room nights from convention-related business in conjunction with the Greater Raleigh Convention and Visitors Bureau.
Related Stories
| Oct 20, 2011
UNT receives nation’s first LEED Platinum designation for collegiate stadium
Apogee Stadium will achieve another first in December with the completion of three wind turbines that will feed the electrical grid that powers the stadium.
| Oct 20, 2011
Johnson Controls appoints Wojciechowski to lead real estate and facilities management business for Global Technology sector
Wojciechowski will be responsible for leading the continued growth of the technology vertical market, while building on the expertise the company has developed serving multinational technology companies.
| Sep 12, 2011
First phase of plan to revitalize Florida's Hialeah Park announced
This is the first project of a master plan developed to revive the historic racetrack.
| May 18, 2011
Improvements add to Detroit convention center’s appeal
Interior and exterior renovations and updates will make the Detroit Cobo Center more appealing to conventioneers. A new 40,000-sf ballroom will take advantage of the center’s riverfront location, with views of the river and downtown.
| May 18, 2011
Carnegie Hall vaults into the 21st century with a $200 million renovation
Historic Carnegie Hall in New York City is in the midst of a major $200 million renovation that will bring the building up to contemporary standards, increase educational and backstage space, and target LEED Silver.
| Apr 13, 2011
Southern Illinois park pavilion earns LEED Platinum
Erin’s Pavilion, a welcome and visitors center at the 80-acre Edwin Watts Southwind Park in Springfield, Ill., earned LEED Platinum. The new 16,000-sf facility, a joint project between local firm Walton and Associates Architects and the sustainability consulting firm Vertegy, based in St. Louis, serves as a community center and special needs education center, and is named for Erin Elzea, who struggled with disabilities during her life.
| Apr 11, 2011
Wind turbines to generate power for new UNT football stadium
The University of North Texas has received a $2 million grant from the State Energy Conservation Office to install three wind turbines that will feed the electrical grid and provide power to UNT’s new football stadium.
| Mar 25, 2011
Qatar World Cup may feature carbon-fiber ‘clouds’
Engineers at Qatar University’s Department of Mechanical and Industrial Engineering are busy developing what they believe could act as artificial “clouds,” man-made saucer-type structures suspended over a given soccer stadium, working to shield tens of thousands of spectators from suffocating summer temperatures that regularly top 115 degrees Fahrenheit.
| Mar 11, 2011
Historic McKim Mead White facility restored at Columbia University
Faculty House, a 1923 McKim Mead White building on Columbia University’s East Campus, could no longer support the school’s needs, so the historic 38,000-sf building was transformed into a modern faculty dining room, graduate student meeting center, and event space for visiting lecturers, large banquets, and alumni organizations.
| Feb 23, 2011
London 2012: What Olympic Park looks like today
London 2012 released a series of aerial images that show progress at Olympic Park, including a completed roof on the stadium (where seats are already installed), tile work at the aquatic centre, and structural work complete on more than a quarter of residential projects at Olympic Village.