PV America 2012 West features a conference program designed to provide attendees from all sectors involved with solar with tools and knowledge for the fast-changing photovoltaics industry.
With more than 30 concurrent educational sessions covering finance, markets, policy, technology, utilities, and cross-cutting issues; four instructional workshops, and four interactive Solar Idea Swaps, the program delivers a wide range of topics that address the key developments and policies that are driving industry growth.
Presented by the Solar Energy Industries Association (SEIA) and the Solar Electric Power Association (SEPA), PV America West is a regional Solar Power International event showcasing exhibits from more than 150 companies, and is expected to draw more than 4,000 industry attendees. The show takes place March 19-21, 2012 at the San Jose Convention Center in San Jose, Calif.
For more information, visit www.solarelectricpower.org. BD+C
Related Stories
| Nov 16, 2011
John Patelski joins Ghafari as executive vice president
As executive vice president, Patelski will be responsible for expanding the firm’s services in new strategic markets.
| Nov 15, 2011
Struggling economy demands construction industry embrace enterprise-wide risk management
In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.
| Nov 15, 2011
Suffolk Construction breaks ground on the Victor housing development in Boston
Project team to manage construction of $92 million, 377,000 square-foot residential tower.
| Nov 15, 2011
Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa
Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.
| Nov 14, 2011
Summit Design+Build selected at GC for new Office Concepts headquarters
The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout.
| Nov 14, 2011
Griffin Electric completes electrical work at Cary Arts Center
The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.
| Nov 14, 2011
303 East 33rd Street building achieves LEED-NC
The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.
| Nov 14, 2011
VanSumeren appointed to Traco general manager
VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco.