Mortenson Construction has released "Integrated Delivery: A Catalyst for Collaboration and Teamwork." The free report summarizes findings from a large group seminar conducted by the contractor at the 2013 AIA Public Architect Workshop, which was held in conjunction with this year's AIA National Convention. Hand-held polling devices were used for collecting feedback and real-time tabulations.
According to the report, interest in IPD is high, but public owners don't always agree on the meaning of the term, and are unsure whether formal multiparty agreements are necessary to achieve the desired goals. Some of the seminar participants said that sharing of risks and rewards is what distinguishes a true integrated delivery model. Others believed the general principles can be applied to multiple types of delivery methods. In general, the idea of integrated delivery involves trust, communication, and a high level of commitment among all involved parties.
The study examines the differences between a contractually defined version of IPD and a version that incorporates the basic principles but not the contracual approach (labeled "ipd.") Regardless of what a method is called, the report indicates that stakeholders for public projects are increasingly interested in methods beyond traditional design-bid-build, with CM at Risk and IPD both selected as the method of "greatest growth in interest" by more than 30% of the respondents.
Despite the attendees' lack of clarity regarding the definition of IPD/ipd, about three quarters believe some type of nontraditional approach will increase the level of teamwork on a project (73%). They also tend to believe IPD will increase collaborative innovation and decisionmaking (64%), shared benefit and reward (55%), mutual respect and trust among participants (55%), harnessing of the talents, expertise, and information of the participants (55%), and shared risks and downside (50%). Only 36% thought IPD would increase the use of VDC/BIM.
Related Stories
| Aug 30, 2013
Modular classrooms gaining strength with school boards
With budget, space needs, and speed-to-market pressures bearing down on school districts, modular classroom assemblies are often a go-to solution.
| Aug 30, 2013
Local Government Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest local government design and construction firms, as reported in the 2013 Giants 300 Report.
| Aug 30, 2013
A new approach to post-occupancy evaluations
As a growing number of healthcare institutions become more customer-focused, post-occupancy evaluations (POE) are playing a bigger role in new construction and renovation projects. Advocate Health Care is among the healthcare organizations to institute a detailed post-occupancy assessment process for its projects.
| Aug 30, 2013
State Government Report [2013 Giants 300 Report]
Stantec, Jacobs, PCL Construction among nation's top state government design and construction firms, according to BD+C's 2013 Giants 300 Report.
| Aug 29, 2013
Is it possible to build a LEED Gold prison?
Why yes, of course it is. Correctional design exerts from Shive-Hattery and the Iowa Department of Corrections will demonstrate how at the upcoming BUILDINGChicago conference and expo, September 9-11 at the Holiday Inn Chicago Mart Plaza.
| Aug 29, 2013
First look: K-State's Bill Snyder Family Stadium expansion
The West Side Stadium Expansion Project at Kansas State's Bill Snyder Family Stadium is the largest project in K-State Athletics history.
Sponsored | | Aug 29, 2013
Nichiha USA panels selected for unique mixed-use project in Cambridge, Mass.
Peter Quinn Architects specifies Nichiha’s Illumination Series Panels for a progressive look for a work/live/play development in the heart of the Harvard community.
| Aug 28, 2013
Focusing on the total client experience
Although firms commonly use client satisfaction surveys and interviews to assess how well their teams are performing, a new article from Harvard Business Review suggests these tools might not provide an accurate picture of the total client experience.
| Aug 28, 2013
Standards for BIM improve reliability of data downstream, but what does this mean for us today?
I’m encouraged to see progress being made to make BIM more useable and reliable downstream. These are all good steps in the right direction, but how can we leverage this additional clarity today? Does it require us to have all stakeholders and team members in the model to collaborate and share information? It appears as if this is the ultimate goal.
| Aug 28, 2013
Building owners to speak out at BUILDINGChicago conference and expo
Real estate professionals from Crate and Barrel, Jones Lang LaSalle, Baxter, Siemens, and Advocate Healthcare are among the building owner representatives that will be attending and speaking at BD+C's new conference and expo, BUILDINGChicago, September 9-11.