flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Public owners have mixed opinions regarding integrated delivery: Mortenson study

Public owners have mixed opinions regarding integrated delivery: Mortenson study

Owners are enthusiastic but don't all agree on what IPD means.


By BD+C Staff | September 20, 2013

Mortenson Construction has released "Integrated Delivery: A Catalyst for Collaboration and Teamwork." The free report summarizes findings from a large group seminar conducted by the contractor at the 2013 AIA Public Architect Workshop, which was held in conjunction with this year's AIA National Convention. Hand-held polling devices were used for collecting feedback and real-time tabulations.

According to the report, interest in IPD is high, but public owners don't always agree on the meaning of the term, and are unsure whether formal multiparty agreements are necessary to achieve the desired goals. Some of the seminar participants said that sharing of risks and rewards is what distinguishes a true integrated delivery model. Others believed the general principles can be applied to multiple types of delivery methods. In general, the idea of integrated delivery involves trust, communication, and a high level of commitment among all involved parties.

The study examines the differences between a contractually defined version of IPD and a version that incorporates the basic principles but not the contracual approach (labeled "ipd.") Regardless of what a method is called, the report indicates that stakeholders for public projects are increasingly interested in methods beyond traditional design-bid-build, with CM at Risk and IPD both selected as the method of "greatest growth in interest" by more than 30% of the respondents.

Despite the attendees' lack of clarity regarding the definition of IPD/ipd, about three quarters believe some type of nontraditional approach will increase the level of teamwork on a project (73%). They also tend to believe IPD will increase collaborative innovation and decisionmaking (64%), shared benefit and reward (55%), mutual respect and trust among participants (55%), harnessing of the talents, expertise, and information of the participants (55%), and shared risks and downside (50%). Only 36% thought IPD would increase the use of VDC/BIM.

Click here to download the complete report 

Related Stories

Building Team Awards | Apr 9, 2015

Nation's first LEED-certified bus depot

A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.

Building Team Awards | Apr 9, 2015

Setting the bar for port-of-entry design

Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.

Building Team Awards | Apr 9, 2015

Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C

Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.

Building Team Awards | Apr 9, 2015

IPD-driven fusion facility serves science and student life in Chicago

In dire need of modern science labs and a student union, North Park University built both—in the same building.

Building Team Awards | Apr 9, 2015

‘Prudent, not opulent’ sets the tone for this Catholic hospital

This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.

Building Team Awards | Apr 9, 2015

9/11 museum triumphs over controversy

The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.

Building Team Awards | Apr 7, 2015

Unique test facility will help make wind power more feasible

A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.

Codes and Standards | Apr 6, 2015

Industry groups petition for change order reform on federal projects

Nine design and construction associations ask for assurance that funds available for additional work.

Libraries | Apr 2, 2015

6 award-winning libraries showcase next-gen design strategies

The new Cedar Rapids Public Library and the restored Slover Library in Norfolk, Va., are among six breakthrough projects honored with 2015 AIA/ALA Library Building Awards.

Office Buildings | Apr 1, 2015

IBM's supercomputer Watson finds new home in Manhattan's Silicon Alley

The new headquarters for the former Jeopardy champ was conceived as a showcase for Watson’s capabilities, and as an inspirational workspace for Millennials and idea generators of all ages.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021