At our Under 40 Leadership Summit in San Francisco - coming up Oct 9-11 - we're premiering the "Vision U40 Competition," in which participating "under 40s" will compete for $5,000 in prizes for the best design-engineering-construction solutions to complex social, economic, and environmental problems, in these broad categories:
- Access + Mobility
- Human Health + Performance
- Aesthetics + Beauty
- Human Spirit + Quality of Life
- Climate Change
- Social Justice
- Environment
- Technological Innovation
Just to clarify, it's $5,000 shared by 5 winning groups: $500 to each of 4 runners-up, and $3000 to the winning group. Still, not a bad deal.
Here's an example of the kind of thing we're looking for: Public Architecture's Day Labor Station.
The civic design group Public Architecture looked at the conditions under which California's day laborers had to suffer every morning as they waited, hour after hour, to be chosen for work - intense heat, no shade, no toilet facilities, no place to keep a sandwich or a drink cold.
They designed the Public Architecture Day Labor Station, a compact modular facility with shading, refrigerator, toilet - see rendering.
That's the kind of progressive solution we're looking for in the Vision U40 Competition. We encourage Under40 Leadership Summit participants to address one or more of the broad social issues described above and offer a practical design/construction-related solution. U40 Summiteers will vote for the Top 5 Finalists, and the highest vote-getter will win the competition.
Sign up before September 13 and get the special Early Bird Registration rate of $195 (use Code U40SF).
NOTE TO AEC FIRMS: You are invited to "self-nominate" up-and-coming young professionals (under age 40) to participate in the U40 Leadership Summit, even if they were not "officially" designated as 40Under40 honorees by Building Design+Construction.
See you in San Francisco on October 9!
Related Stories
| Nov 1, 2010
John Pearce: First thing I tell designers: Do your homework!
John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.