flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

£175 million 'Garden Bridge' gets the green light to cross the Thames

£175 million 'Garden Bridge' gets the green light to cross the Thames

Some organizations have expressed concern about the construction plans, especially the bridge's expected seven million annual visitors.


By BD+C Staff | December 4, 2014

Crossing the Thames is about to become more pedestrian-friendly. Westminster Council has approved a £175 million 'Garden Bridge' that will allow pedestrian traffic only. 

The Mayor of London is the last person who needs to approve the bridge, and Londonist reports that he is in favor of its construction. If built, it will span the Thames from the Temple tube station to the South Bank. 

Some organizations have expressed concern about the plans, especially the bridge's expected seven million annual visitors. In addition, cyclists do not appreciate the fact that the bridge will be open only to pedestrians. 

Between the government, Transport for London and private donors, £90 million has been raised for the bridge's construction so far. The mayor has said that the bridge will reduce auto traffic by providing more opportunities for city denizens to walk; that it will benefit the local economy; and that it will improve the health and quality of life for London residents and visitors.

The bridge is slated to open in 2018. 

Related Stories

| Nov 22, 2011

Jones Lang LaSalle completes construction of two new stores in Manhattan

Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.

| Nov 21, 2011

Mortenson and enXco partnership to build its 19th wind project

The 8,500 acres project will generate140 megawatts of wind power – enough energy to power approximately 39,000 homes.

| Nov 21, 2011

FDH Engineering acquires Energy Solutions

All ESI employees have been merged into FDH’s staff at its St. Louis office.

| Nov 18, 2011

Centre for Interactive Research on Sustainability opens

Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.

| Nov 17, 2011

SmithGroup changes name to SmithGroupJJR

SmithGroup and JJR join brands to become a single, multi-disciplinary company.

| Nov 17, 2011

Campus-wide energy-efficiency program aims to deliver $3.5 million in energy and operational savings

Merced College and Honeywell will use the school’s energy usage statistics to develop a course curriculum on sustainability, and raise awareness among students of the positive impact conservation practices contribute to the community.

| Nov 17, 2011

Hollister Construction Services renovating bank in Union City, N.J.

Project is part of a series of ground-up construction and renovation assignments.

| Nov 16, 2011

Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.

This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.

| Nov 16, 2011

Architecture Billings Index moves upward

The Architecture Billings Index climbed nearly three points in October. 

boombox1
boombox2
native1

More In Category




Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021