flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Proposal to add photovoltaic panels to the R2 Standard for electronics recycling

Codes and Standards

Proposal to add photovoltaic panels to the R2 Standard for electronics recycling

Hundreds of facilities in 33 countries could begin recycling PVs.


By Peter Fabris, Contributing Editor | May 26, 2021

Courtesy Pixabay

SERI (Sustainable Electronics Recycling International) says that the R2 Technical Advisory Committee is considering a formal proposal to add photovoltaic (PV) panels to the R2 Standard.

The R2 Standard is focused on the effective recycling of electronics products. SERI anticipates incorporating PV panels into the standard would require at least two years of development, public review and comment, and revision before it would be adopted.

“The PV industry is extremely progressive,” said SERI executive director Corey Dehmey. “With much foresight, they took the initiative to create a sustainable plan for when solar panels are removed from use. There are hundreds of R2 Certified facilities in 33 countries around the world who currently do, or could relatively easily, add PV panels to their service offering. We see this as a great way to quickly build reuse and recycling infrastructure for the environmentally sound management of PV panels.”

A workgroup of 24 volunteers from the solar industry met over six months to assess the suitability of including PV panels in the current version of the R2 Standard.

Related Stories

Codes and Standards | Oct 17, 2017

Updated versions of EnergyPlus and OpenStudio building energy modeling tools released

Open-source apps include enhancements for urban-scale modeling.

Codes and Standards | Oct 16, 2017

New, comprehensive insurance exhibit released in AIA 2017 contract document updates

Will allow AIA to make updates more frequently as insurance market changes.

Codes and Standards | Oct 12, 2017

New AIA contract document designates responsibilities for sustainable projects

Roles of architects, contractors outlined in E204–2017.

Codes and Standards | Oct 11, 2017

Data, transparency are keys to next steps in green building, says USGBC chief

Monitoring and comparing performance are critical to advancing sustainability goals.

Codes and Standards | Oct 10, 2017

New guidelines for quality control on application of membrane roof systems released

NRCA document provides guidance for on-site evaluation.

Codes and Standards | Oct 9, 2017

New app calculates maximum allowable heights for building occupancy types, classes of construction

The app streamlines compliance on various types of construction.

Codes and Standards | Oct 5, 2017

California lawmakers pass bill that requires GCs to pay wages of sub employees if subs fail to pay

The measure will go into effect in January if the governor signs it.

Codes and Standards | Oct 4, 2017

Ambitious but realistic increase in clean energy would cut GHG emissions by 80% in the U.S.

NRDC report says goal can be achieved with existing tools.

Codes and Standards | Oct 3, 2017

Reducing duct leakage is focus on latest green building standards updates

ASHRAE 189.1 broadens testing requirements to include more types of ducts.

Codes and Standards | Oct 2, 2017

Nationwide retrofit strategy in Canada could cut 51% of emissions from large buildings

The roadmap provides government and industry with a targeted plan.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021