The design vision for Gran Patio Santa Fe–Mexico City’s first-ever high-rise building to blend retail, lifestyle, and commercial office space–was showcased at the annual International Council of Shopping Centers Center Build Conference November 28-30 in Phoenix.
A presentation kicked off of the project’s first phase of above-ground construction, with the overall effort slated for completion in summer/fall 2013. Designed to be a national model for addressing high urban density through commercial development, the nine-story building was designed by Stantec’s Boulder-based ViBE (i.e. Visioning, Branding, Experiences) group, in association with Taller Unico de Arquitectos and is owned by Mexico Retail Properties and Icon Group out of Mexico City. Stantec Senior Architectural Designer Daniel Aizenman will facilitate the presentation alongside Alonso Ruiz De Velasco, the architect of record, to showcase designed innovations which address growing market needs in Mexico’s urban markets.
Located in Mexico City’s financial and education district of Santa Fe, Gran Patio’s nine stories are being developed on 9.8 acres featuring big and junior box retail tenants (e.g. Walmart, Sam’s Club, Home Depot), 130 retail shops and 25 food and beverage concepts. Blending lifestyle and entertainment features, the 2.1 million-square-foot development includes a 16-screen movie theater, casino, and a 70,000-sf, glass-covered rooftop park with shopping, dining, wellness and entertainment venues.
Additionally, Gran Patio Santa Fe will feature four stories of office, educational academy tenants and a 3,000-space underground parking garage which recently finished its construction. +
Related Stories
| May 18, 2011
Addition provides new school for pre-K and special-needs kids outside Chicago
Perkins+Will, Chicago, designed the Early Learning Center, a $9 million, 37,000-sf addition to Barrington Middle School in Barrington, Ill., to create an easily accessible and safe learning environment for pre-kindergarten and special-needs students.
| May 18, 2011
Raphael Viñoly’s serpentine-shaped building snakes up San Francisco hillside
The hillside location for the Ray and Dagmar Dolby Regeneration Medicine building at the University of California, San Francisco, presented a challenge to the Building Team of Raphael Viñoly, SmithGroup, DPR Construction, and Forell/Elsesser Engineers. The 660-foot-long serpentine-shaped building sits on a structural framework 40 to 70 feet off the ground to accommodate the hillside’s steep 60-degree slope.
| May 18, 2011
New center provides home to medical specialties
Construction has begun on the 150,000-sf Medical Arts Pavilion at the University Medical Center in Princeton, N.J.
| May 18, 2011
Improvements add to Detroit convention center’s appeal
Interior and exterior renovations and updates will make the Detroit Cobo Center more appealing to conventioneers. A new 40,000-sf ballroom will take advantage of the center’s riverfront location, with views of the river and downtown.
| May 18, 2011
One of Delaware’s largest high schools seeks LEED for Schools designation
The $82 million, 280,000-sf Dover (Del.) High School will have capacity for 1,800 students and feature a 900-seat theater, a 2,500-seat gymnasium, and a 5,000-seat football stadium.
| May 18, 2011
Carnegie Hall vaults into the 21st century with a $200 million renovation
Historic Carnegie Hall in New York City is in the midst of a major $200 million renovation that will bring the building up to contemporary standards, increase educational and backstage space, and target LEED Silver.
| May 17, 2011
Redesigning, redefining the grocery shopping experience
The traditional 40,000- to 60,000-sf grocery store is disappearing and much of the change is happening in the city. Urban infill sites and mixed-use projects offer grocers a rare opportunity to repackage themselves into smaller, more efficient, and more convenient retail outlets. And the AEC community will have a hand in developing how these facilities will look and operate.
| May 17, 2011
Architecture billings index fell in April, hurt by tight financing for projects
The architecture billings index, a leading indicator of U.S. construction activity, fell in April, hurt by tight financing for projects. The architecture billings index fell 2.9 points last month to 47.6, a level that indicates declining demand for architecture services, according to the American Institute of Architects.