The design vision for Gran Patio Santa Fe–Mexico City’s first-ever high-rise building to blend retail, lifestyle, and commercial office space–was showcased at the annual International Council of Shopping Centers Center Build Conference November 28-30 in Phoenix.
A presentation kicked off of the project’s first phase of above-ground construction, with the overall effort slated for completion in summer/fall 2013. Designed to be a national model for addressing high urban density through commercial development, the nine-story building was designed by Stantec’s Boulder-based ViBE (i.e. Visioning, Branding, Experiences) group, in association with Taller Unico de Arquitectos and is owned by Mexico Retail Properties and Icon Group out of Mexico City. Stantec Senior Architectural Designer Daniel Aizenman will facilitate the presentation alongside Alonso Ruiz De Velasco, the architect of record, to showcase designed innovations which address growing market needs in Mexico’s urban markets.
Located in Mexico City’s financial and education district of Santa Fe, Gran Patio’s nine stories are being developed on 9.8 acres featuring big and junior box retail tenants (e.g. Walmart, Sam’s Club, Home Depot), 130 retail shops and 25 food and beverage concepts. Blending lifestyle and entertainment features, the 2.1 million-square-foot development includes a 16-screen movie theater, casino, and a 70,000-sf, glass-covered rooftop park with shopping, dining, wellness and entertainment venues.
Additionally, Gran Patio Santa Fe will feature four stories of office, educational academy tenants and a 3,000-space underground parking garage which recently finished its construction. +
Related Stories
| Jun 30, 2014
Zaha Hadid's Iraq Parliament complex design marred with controversy
Zaha Hadid's design for the Iraq Parliament was selected, despite placing third in the original RIBA-organized competition.
Sponsored | | Jun 27, 2014
SAFTI FIRST Now Offers GPX Framing with Sunshade Connectors
For the Doolittle Maintenance Facility, SAFTI FIRST provided 60 minute, fire resistive wall openings in the exterior using SuperLite II-XL 60 insulated with low-e glazing in GPX Framing with a clear anodized finish.
| Jun 26, 2014
Glazing offers peace-of-mind for hurricane season
SPONSORED CONTENT As hurricane season kicks into high gear, it reinforces the importance of balancing the aesthetic and daylight enhancements of glazing with the safety requirements to protect people and structures from hurricane-force winds.
| Jun 26, 2014
Plans for Britain’s newest landmark brings in international cooperation
Designers of the London Eye will team up with companies from France, the Netherlands and the United States to construct i360 Brighton, the U.K.'s newest observation tower.
| Jun 25, 2014
The best tall buildings of 2014
Four high-rise buildings from multiple continents have been selected as the best of their region. The best worldwide tall building will be announced November 6.
| Jun 25, 2014
AIA Foundation launches Regional Resilient Design Studio
The Studio is the first to be launched as part of the AIA Foundation’s National Resilience Program, which plans to open a total of five Regional Resilience Design Studios nationwide in collaboration with Architecture for Humanity, and Public Architecture.
| Jun 25, 2014
Frank Lloyd Wright’s Spring House, Cincinnati’s Union Terminal among 11 Most Endangered Historic Places for 2014
The National Trust for Historic Preservation released its annual list of 11 Most Endangered Historical Sites in the United States for 2014.
| Jun 25, 2014
Best of Britain: 56 buildings make it to the RIBA Stirling Prize's longlist
The longlist for the 2014 prize includes Foster + Partners' Marseille and London's now-famous Shard, designed by Renzo Piano.
| Jun 25, 2014
Green Building Initiative Announces New Appointments to Board
Glumac consulting engineer CEO Steve Straus and Plum Creek director of real estate Doug Cole join GBI's board of directors.
| Jun 25, 2014
Taking a page from Lean manufacturing for improved design review processes
SPONSORED CONTENT As more building project teams look for ways to collaborate better, technology continues to provide solutions. Yet, as I learned from the experience of one of my customers, choosing the wrong technology can have an underwhelming effect, causing a team to simply swap out old challenges for new ones.