flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Prognosis: Positive: Rutgers University-Camden Nursing and Science Building

Building Team Awards

Prognosis: Positive: Rutgers University-Camden Nursing and Science Building

Gold Award: Can a new nursing school breathe life into America’s third-poorest city?


By Robert Cassidy, Executive Editor | May 18, 2018
The new Rutgers nursing school

The new Rutgers nursing school sits on a triangular site between Camden’s city hall and a light-rail transit station. Sarah Mechling/Perkins Eastman.

At $26,783 median family income, Camden, N.J., ranks just behind Reading, Pa., and Flint, Mich., in poverty level among U.S. cities of 65,000 or more. Lying just across the Delaware River from Philadelphia, the city of 74,420, home of Campbell’s Soup Company, has been battling economic decline for decades.

Civic leaders are crossing their fingers that the new Rutgers University–Camden: Nursing and Science Building will revivify the downtown. Located on a long-vacant triangle between City Hall, Roosevelt Plaza Park, and the River Line light rail that links to Trenton, the 101,000-sf nursing school adds to the “eds and meds” anchor institutions that provide 45% of the city’s jobs.

Designed by Perkins Eastman (with architect of record NELSON Architects), the $62.5 million angular structure involved the city, Rutgers University–Camden, Cooper University Hospital, and Cooper Medical School of Rowan University among its stakeholders.

 

Primary interior circulation parallels the city grid and is repeated on all four levels. Sarah Mechling/Perkins Eastman.

 

The Building Team Awards jury was most impressed with the project team’s handling of the triangular site, whose awkward geometry posed difficulties for placing labs, simulation spaces, and classrooms. To accommodate an orthogonal spatial program inside a non-orthogonal building envelope, the designers organized the more flexible collaborative and social program elements along the building’s diagonal. This opened up the interior for teaching spaces while lending spatial dynamism to the building’s public spaces.

The nursing school’s remoteness from the main campus—a three- or four-block walk—meant that the students would likely spend nearly all their time in this one facility. This restriction demanded the crafting of an interior environment that could satisfy the many needs of the students—learning, socializing, collaborating, and studying—over a four-year period.

The designers created four unique two-story common areas for dining, individual activity, social interaction, and formal gatherings. The four spaces are knit together by a network of smaller social and study environments along the Student Street side of the building. Taken together, the collection of varied interior environments creates a campus within a single building.

 

One of four two-story common areas for dining, social interaction, and formal events. Sarah Mechling/Perkins Eastman.

 

In the midst of construction, the university requested a redesign of the 300-seat lecture hall to accommodate new AV/IT technology that would link Camden with two similar spaces at Rutgers’s campuses in New Brunswick and Newark—all part of an advanced distance learning initiative by the state university system. The design team, contractor Hunter Roberts Construction Group, city officials, and the AV/IT vendors worked to make it happen without undue disruption to the construction schedule.

Built to LEED Silver standards, the four-story building is heated and cooled via a radiant floor system. Other green features: chilled beams, low pressure drop air-handling systems, high-efficiency chillers, LED lighting, and low-flow plumbing.

The new Nursing and Science Building was the first new construction since the merger of Rutgers University and the University of Medicine and Dentistry of New Jersey, in 2013. The hope is that it will lead to a rebranding of Camden as a center of excellence for education and health.

 

Campus plan shows the triangular site's distance from main campus.

 

 

Building Team — Submitting firm, architect, interior architect Perkins Eastman Owner Rutgers University–Camden Architect of record NELSON Architects SE O’Donnell & Naccarato CE Langan Engineering MEP Vanderweil Roofing consultant Roof Maintenance Systems Façade consultant Atelier 10 GC Hunter Roberts Construction Group CM Greyhawk

General information – Size 101,000 gsf Cost $62.5 million Construction time July 2015 to November 2017 Delivery method Design-bid-build

 

Return to the 2018 Building Team Awards Landing Page

Related Stories

Building Team Awards | May 27, 2016

Big police academy trains thousands of New York's finest

The Police Training Academy in Queens, N.Y., consists of a 480,000-sf academic/administration building and a 240,000-sf physical training facility, linked by an aerial pedestrian bridge.

Building Team Awards | May 26, 2016

Cimpress office complex built during historically brutal Massachusetts winter

Lean construction techniques were used to build 275 Wyman Street during a winter that brought more than 100 inches of snow to suburban Boston.

Building Team Awards | May 25, 2016

New health center campus provides affordable care for thousands of Northern Californians

The 38,000-sf, two-level John & Susan Sobrato Campus in Palo Alto is expected to serve 25,000 patients a year by the end of the decade.

Building Team Awards | May 24, 2016

Los Angeles bus depot squeezes the most from a tight site

The Building Team for the MTA Division 13 Bus Operations and Maintenance Facility fit 12 acres’ worth of programming in a multi-level structure on a 4.8-acre site.

Building Team Awards | May 23, 2016

'Greenest ballpark' proves a winner for St. Paul Saints

Solar arrays, a public art courtyard, and a picnic-friendly “park within a park" make the 7,210-seat CHS Field the first ballpark to meet Minnesota sustainable building standards.

Building Team Awards | May 20, 2016

Pittsburgh's Tower at PNC Plaza raises the bar on high-rise greenness

The Building Team designed the 800,000-sf tower to use 50% less energy than a comparable building. A 1,200-sf mockup allowed the team to test for efficiency, functionality, and potential impact on the building’s occupants.

Building Team Awards | May 19, 2016

Chinatown library unites and serves two emerging Chicago neighborhoods

The 16,000-sf, pebble-shaped Chinatown Branch Library was built at the intersection of new and old Chinatown neighborhoods. The goal is for the building to unite the communities and serve as a catalyst for the developing area.

Building Team Awards | May 19, 2016

NYC subway station lights the way for 300,000 riders a day

Fulton Center, which handles 85% of the riders coming to Lower Manhattan, is like no other station in the city’s vast underground transit web—and that’s a good thing.

Building Team Awards | May 16, 2016

Upstate New York performing arts center revives once-toxic lakefront site

Early coordination, prefabrication, and judicious value engineering contributed to the accelerated completion of the Onondaga Lakeview Ampitheater, a Upstate New York design-build project.     

Building Team Awards | May 16, 2016

12 building projects that represent the best in AEC team collaboration

A busy, light-filled Manhattan subway station and a pebble-shaped Chicago library are among the winners of the 19th annual Building Team Awards. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021