TWO NEW PV SYSTEMS OFFER NON-PENETRATING INSTALLATION
Two new PV systems are available: 1) a rigid glass-based polycrystalline silicon module that can be installed on standing seam metal roofs using a non-penetrating clamp, and 2) a flexible, thin film module that can be adhered to the metal roof panel in a factory environment, allowing the PV array and roof panels to be installed simultaneously. These PV systems can be installed on existing and new metal roofs because they don’t penetrate the substrate. Furthermore, a metal roof likely will outlive the solar equipment, saving removal and replacement costs associated with other roof materials.
LIGHT SHELF ALLOWS FOR EASY CLEANING
The InLighten light shelf features an extruded-aluminum chassis system in several panel choices. It comes in depths of up to 30 inches of reflective surface. InLighten light shelf’s new design incorporates a unique mounting bracket that allows the panel to be tilted for cleaning, an important maintenance factor in schools, daycare centers, offices, and other commercial and institutional applications. The light shelf can be attached to multiple curtain wall systems and storefront framing systems for application in new construction and retrofits.
NEW COMBINATION FIRE ALARM/ECS MEETS NFPA, UL, DOD STANDARDS
The Farenhyt Emergency Communication System (ECS) provides fire alarm technology and mass notification capabilities in an all-in-one system. This real-time communications system meets the latest NFPA 72, UL 2572, and Department of Defense standards and runs on most wire-types, making it an effective retrofit option. As many as seven ECS-RCUs (“remote command units”) can tie into a facility’s Farenhyt ECS system to provide live paging in specific areas of a property. BD+C
Related Stories
| Jul 18, 2012
Green expert Kats joins GreenWizard as an advisor
Kats' role is to help further expand GreenWizard’s impact in the sustainable construction industry.
| Jul 18, 2012
Construction employment stagnates in June
Lack of hiring in construction combined with job growth elsewhere threatens to create skilled-labor gap once contractors are ready to hire again.
| Jul 18, 2012
Legat & Kingscott relocates architecture/interior design office
Move enables the architecture/interior design firm to better serve its expanding clientele.
| Jul 18, 2012
Alcoa appoints Hunter Architectural Manager
Hunter to operate with the goal of driving specification, new product adoption and overall demand for the Alcoa BCS North America product range.
| Jul 17, 2012
AIA and Architecture for Humanity select Disaster Response Grant recipients
Awards help each group implement their locally driven preparedness project in the second half of the year.
| Jul 17, 2012
KM/Plaza changes name to Plaza Construction
Lands new projects including the Perry South Beach Hotel and Dadeland Mall Kendall Wing Expansion.
| Jul 17, 2012
Dr. Phillips Charities Headquarters Building receives LEED Silver
The building incorporates sustainable design features, environmentally-friendly building products, energy efficient systems, and environmentally sensitive construction practices.
| Jul 16, 2012
BD+C Under 40 Leadership Summit scheduled
Attendee registration for U40 Summit II now open.
| Jul 16, 2012
Construction spending at 2 ½ year peak
Construction economist Ken Simonson says that four private nonresidential categories each posted 12-month spending increases of more than 25%: power and energy construction, 35%; hotels, 29%; educational and manufacturing, 27% apiece.
| Jul 16, 2012
Chen named design director at Heery
Chen comes to Heery from his own firm, Mark Chen Architect, a design and planning consulting firm, based in New York City, whose recent work includes large-scale planning studies for mixed-use projects.