flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Product Solutions June 2012

Product Solutions June 2012

Curing agents; commercial faucets; wall-cladding systems.


By By Raissa Rocha, Associate Editor | May 31, 2012
This article first appeared in the June 2012 issue of BD+C.

LOW-EMISSION PRODUCTS HELP MEET HIGH-PERFORMANCE STANDARDS

A new line of Dow Epoxy products feature high-performance D.E.H. curing agents. The portfolio includes epoxy components,specialty resins, curing agents, resin blends, and formulated hardener solutions. Specialty offerings in the expanded epoxy portfolio include low-emission and waterborne curing agents. The next-generation D.E.H. 800 waterborne series curing agents are particularly useful in flooring and indoor locations where organic solvents need to be avoided. Benefits include low odor, rapid drying and curing for faster application, and curing ability at low temperatures to allow application in a variety of seasons.

Dow Epoxy

Circle No. 806 on Reader Service Card

NEW COMMERCIAL FAUCETS PROVIDE MODERN STYLE, WATER SAVINGS

Designed for the commercial plumbing industry, the new 3500 Series of water metering faucets provides a modern look for offices, retail stores, restaurants, and hospitality settings. The self-closing MVP metering cartridge provides precise water flow and shuts off automatically, conserving water. The series’ solid ECAST brass, chrome-plated body meets local requirements for the reduction of lead in plumbing fixtures. Pre-installed stainless steel hoses connect to standard water supplies. Internal temperature control is accessible above the deck for easy adjustment.

Chicago Faucets

Circle No. 807 on Reader Service Card

WALL-CLADDING SYSTEMS GIVE EDGE TO INTERIOR SPACES

Edge interior cladding systems come in four configurations and can also be customized to fit a wide range of spaces. Made with 3form Studio’s Varia Ecoresin material and available in thousands of C3 color interlayers, Edge systems allow Building Teams to refine hues, intensify colors, and alter light transmission to any desired effect, creating a contoured, motion-filled look to interior spaces. Edge systems are premade wall-cladding solutions for 3form’s collection of Ready to Go packages.

3form Studio

Circle No. 808 on Reader Service Card

Related Stories

| Apr 19, 2012

The 10 mistakes most likely to get you sued

The California Chamber of Commerce has produced a white paper cataloging the top 10 mistakes most likely to get a company sued. While a few of the laws cited apply specifically to California, some of them are federal and may apply in your state.

| Apr 19, 2012

Holcim cement plants recognized at PCA Spring Meeting

The Holly Hill plant received the PCA’s Chairman’s Safety Performance Award in recognition of their exceptional health and safety programs. The Theodore plant received the Environmental Performance Award in recognition of the steps they take beyond those required by laws, regulations and permits to minimize their impact on the environment.

| Apr 19, 2012

KTGY Group’s Arista Uptown Apartments in Broomfield, Colo. completed

First of eight buildings highlights unique amenities.

| Apr 19, 2012

Nauset begins work on $20M Joint Forces HQ at Hanscom AFB

3D imaging key to project timetable and cost containment.

| Apr 19, 2012

HBD Construction names Steven Meeks vice president

Meeks will provide expertise for the company in its many diverse areas of construction projects including health care, senior living, education and retail.

| Apr 18, 2012

Lafarge moving North American headquarters to Illinois

Lafarge CEO John Stull says the factors in their decision were location in the Midwest and area transportation.

| Apr 18, 2012

Positive conditions persist for Architecture Billings Index

The AIA reported the March ABI score was 50.4, following a mark of 51.0 in February; greatest demand is for commercial building projects.

| Apr 18, 2012

Syska Hennessy re-launches Information and Communication Technology practice

The ICT practice will focus a blend of products including Information Technology, Security, Audiovisual, Building Automation, Fire Life Safety, Medical Communications and Intelligent Building Systems.

| Apr 18, 2012

Perkins+Will designs new complex for Johns Hopkins Hosptial

The Charlotte R. Bloomberg Children’s Center and the Sheikh Zayed Tower create transformative patient-centric care.

| Apr 18, 2012

BBS Architects & Engineers acquires Ward Associates

The merged companies’ on-going project portfolio valued at $220 million.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021