flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Product Solutions June 2012

Product Solutions June 2012

Curing agents; commercial faucets; wall-cladding systems.


By By Raissa Rocha, Associate Editor | May 31, 2012
This article first appeared in the June 2012 issue of BD+C.

LOW-EMISSION PRODUCTS HELP MEET HIGH-PERFORMANCE STANDARDS

A new line of Dow Epoxy products feature high-performance D.E.H. curing agents. The portfolio includes epoxy components,specialty resins, curing agents, resin blends, and formulated hardener solutions. Specialty offerings in the expanded epoxy portfolio include low-emission and waterborne curing agents. The next-generation D.E.H. 800 waterborne series curing agents are particularly useful in flooring and indoor locations where organic solvents need to be avoided. Benefits include low odor, rapid drying and curing for faster application, and curing ability at low temperatures to allow application in a variety of seasons.

Dow Epoxy

Circle No. 806 on Reader Service Card

NEW COMMERCIAL FAUCETS PROVIDE MODERN STYLE, WATER SAVINGS

Designed for the commercial plumbing industry, the new 3500 Series of water metering faucets provides a modern look for offices, retail stores, restaurants, and hospitality settings. The self-closing MVP metering cartridge provides precise water flow and shuts off automatically, conserving water. The series’ solid ECAST brass, chrome-plated body meets local requirements for the reduction of lead in plumbing fixtures. Pre-installed stainless steel hoses connect to standard water supplies. Internal temperature control is accessible above the deck for easy adjustment.

Chicago Faucets

Circle No. 807 on Reader Service Card

WALL-CLADDING SYSTEMS GIVE EDGE TO INTERIOR SPACES

Edge interior cladding systems come in four configurations and can also be customized to fit a wide range of spaces. Made with 3form Studio’s Varia Ecoresin material and available in thousands of C3 color interlayers, Edge systems allow Building Teams to refine hues, intensify colors, and alter light transmission to any desired effect, creating a contoured, motion-filled look to interior spaces. Edge systems are premade wall-cladding solutions for 3form’s collection of Ready to Go packages.

3form Studio

Circle No. 808 on Reader Service Card

Related Stories

| May 7, 2012

2012 BUILDING TEAM AWARDS: Fort Belvoir Community Hospital

A new military hospital invokes evidence-based design to create a LEED-certified facility for the nation’s soldiers and their families.

| May 7, 2012

2012 BUILDING TEAM AWARDS: Audie L. Murphy VA Hospital

How a Building Team created a high-tech rehabilitation center for wounded veterans of the conflicts in Iraq and Afghanistan.

| May 3, 2012

2012 BUILDING TEAM AWARDS: Rush University Medical Center

This fully integrated Building Team opted for a multi-prime contracting strategy to keep construction going on Chicago’s Rush University Medical Center, despite the economic meltdown.

| May 3, 2012

U of Michigan team looking to create highly efficient building envelope designs

The system combines the use of sensors, novel construction materials, and utility control software in an effort to create technology capable of reducing a building’s carbon footprint.

| May 3, 2012

Best commercial modular buildings and marketing programs recognized

Judges scored entries on architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete.

| May 3, 2012

Zero Energy Research Lab opens at North Texas

The living lab—the only one of its kind in Texas—is designed to test various technologies and systems in order to achieve a net-zero consumption of energy.

| May 3, 2012

NSF publishes ANSI standard evaluating the sustainability of single ply roofing membranes

New NSF Standard provides manufacturers, specifiers and building industry with verifiable, objective criteria to identify sustainable roofing products.

| May 3, 2012

Gilbane to provide CM services for North Reading’s integrated middle/high school

The project scope includes a wastewater treatment plant, demolition of the existing high school and extensive athletic fieldwork.

| May 3, 2012

Howard S. Turner 1911–2012

A founding member of the Turner Construction Co.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021