flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Product Solutions June 2012

Product Solutions June 2012

Curing agents; commercial faucets; wall-cladding systems.


By By Raissa Rocha, Associate Editor | May 31, 2012
This article first appeared in the June 2012 issue of BD+C.

LOW-EMISSION PRODUCTS HELP MEET HIGH-PERFORMANCE STANDARDS

A new line of Dow Epoxy products feature high-performance D.E.H. curing agents. The portfolio includes epoxy components,specialty resins, curing agents, resin blends, and formulated hardener solutions. Specialty offerings in the expanded epoxy portfolio include low-emission and waterborne curing agents. The next-generation D.E.H. 800 waterborne series curing agents are particularly useful in flooring and indoor locations where organic solvents need to be avoided. Benefits include low odor, rapid drying and curing for faster application, and curing ability at low temperatures to allow application in a variety of seasons.

Dow Epoxy

Circle No. 806 on Reader Service Card

NEW COMMERCIAL FAUCETS PROVIDE MODERN STYLE, WATER SAVINGS

Designed for the commercial plumbing industry, the new 3500 Series of water metering faucets provides a modern look for offices, retail stores, restaurants, and hospitality settings. The self-closing MVP metering cartridge provides precise water flow and shuts off automatically, conserving water. The series’ solid ECAST brass, chrome-plated body meets local requirements for the reduction of lead in plumbing fixtures. Pre-installed stainless steel hoses connect to standard water supplies. Internal temperature control is accessible above the deck for easy adjustment.

Chicago Faucets

Circle No. 807 on Reader Service Card

WALL-CLADDING SYSTEMS GIVE EDGE TO INTERIOR SPACES

Edge interior cladding systems come in four configurations and can also be customized to fit a wide range of spaces. Made with 3form Studio’s Varia Ecoresin material and available in thousands of C3 color interlayers, Edge systems allow Building Teams to refine hues, intensify colors, and alter light transmission to any desired effect, creating a contoured, motion-filled look to interior spaces. Edge systems are premade wall-cladding solutions for 3form’s collection of Ready to Go packages.

3form Studio

Circle No. 808 on Reader Service Card

Related Stories

Contractors | Apr 20, 2015

Too many construction projects don’t meet owners’ expectations: KPMG report

Causes for delays, overruns, and underperformance include project management talent shortages, distrust between owners and contractors, and the lack of fully integrated project management systems.     

High-rise Construction | Apr 17, 2015

Construction begins on Goettsch Partners-designed Nanning China Resources Center Tower

The tower's design is derived from its multiple uses, which include 170,000 sm of Class A office space, 5,000 sm of boutique retail, and a 45,000-sm luxury Shangri-La hotel.

Museums | Apr 16, 2015

SANAA and Snøhetta tie at first place for Budapest museum bid

The two firms submitted designs for the New National Gallery and Ludwig Museum, one of five planned museums to be constructed in a park just outside the urban center of Hungary’s capital. 

High-rise Construction | Apr 16, 2015

Construction begins on Seattle's Tibet-inspired Potala Tower

Construction on the 41-story Potala Tower in Seattle finally kicked off following a ground-breaking ceremony seven months ago.

Architects | Apr 14, 2015

Jeanne Gang, Bjarke Ingels among participants for inaugural Chicago Architecture Biennial

Some big names include Bjarke Ingels Group and Studio Gang Architects

Sports and Recreational Facilities | Apr 13, 2015

USTA breaks ground on what will be the country’s largest tennis complex

The 63-acre facility is being positioned as a cornerstone for a sports innovation and performance district in Lake Nona, Fla., a 7,000-acre master planned community that continues to expand.

Building Team Awards | Apr 10, 2015

14 projects that push AEC teaming to the limits

From Lean construction to tri-party IPD to advanced BIM/VDC coordination, these 14 Building Teams demonstrate the power of collaboration in delivering award-winning buildings. These are the 2015 Building Team Award winners.

Building Team Awards | Apr 10, 2015

Prefab saves the day for Denver hospital

Mortenson Construction and its partners completed the 831,000-sf, $623 million Saint Joseph Hospital well before the January 1, 2015, deadline, thanks largely to their extensive use of offsite prefabrication.

Building Team Awards | Apr 10, 2015

Anaheim’s soaring intermodal hub

Anaheim's Regional Transportations Intermodal Center is the largest ETFE project in North America.

Building Team Awards | Apr 10, 2015

Virtual collaboration helps complete a hospital in 24 months

PinnacleHealth needed a new hospital STAT! This team delivered it in two years, start to finish.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021