flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Priced to sell: DUMBO condo development offers starter units in luxury setting

Multifamily Housing

Priced to sell: DUMBO condo development offers starter units in luxury setting

Designed by ODA New York, 98 Front Street will be loaded with amenities like a salt water pool, co-working spaces, and indoor and outdoor fitness centers.


By By Jonathan Barnes, Contributing Editor | April 8, 2019
Priced to sell: DUMBO condo development offers starter units in luxury setting

Rendering: Craft

Planned as a sleek, modernistic structure catering to today’s busy city dweller lifestyle, 98 Front Street is DUMBO’s newest luxury condominium development.

The 11-story luxury condominium was designed by ODA New York and will have 165, studio, one-, two-, three-, and four-bedroom residences ranging from 400 sf to more than 2,000 sf. Asking prices will start at $595,000, which in the sky high real estate market of New York City, offer a rather affordable option for first-time buyers and professionals looking to buy into the hot market.

98 Front Street condos will have 10-foot ceiling heights, eight-foot solid core doors, five-inch-wide white oak flooring, and oversized insulated sound-attenuated windows. Each unit also will have Latch smart access keyless locks, Butterfly MX smart intercoms, and high-speed wiring. The building will have a 24-7 doorman.  

 

Rendering: Craft

 

“At 98 Front Street we set out to design an environmentally friendly, wellness-centered, and design-forward building that both stands out and compliments the neighborhood’s historic and industrial aesthetic,” said Sha Dinour, a Partner with the building’s developer, Hopestreet.  

In a market in which a small apartment can easily cost more than six figures even in a converted building, having units that are new, state-of-the-art, and available at well below a seven-figure price tag should bring a rush of buyers to the development. 

 

SEE ALSO: Here's what $41M will buy you in the OMA-designed Avery tower in SF

 

The building will have an indoor salt water pool, spa, steam room, indoor and outdoor fitness centers, and a lobby with a sculptured reflecting pool. Residents will be able to access a 7,000-sf rooftop featuring barbecue grills, three outdoor kitchens, a bocce ball court, outdoor screening area, and a resident’s lounge and co-working space. Bike storage, on-site parking and resident storage units will also be available for a fee.

The project is expected to open next year. 

 

Related Stories

Coronavirus | Aug 25, 2020

Video: 5 building sectors to watch amid COVID-19

RCLCO's Brad Hunter reveals the winners and non-winners of the U.S. real estate market during the coronavirus pandemic.

Multifamily Housing | Aug 24, 2020

Portland’s zoning reform looks to boost the ‘missing middle’ of housing

The city council in Portland, Ore., recently approved the “Residential Infill Project” (RIP), a package of amendments to the city’s zoning code that legalizes up to four homes on nearly any residential lot and sharply limits building sizes.

Multifamily Housing | Aug 24, 2020

Texaco’s century-old headquarters is now a luxury apartment community

After sitting vacant for nearly three decades, the former home of Texaco, Inc. has been converted into a 17-story, 286-unit apartment building in the heart of downtown Houston.

Multifamily Housing | Aug 23, 2020

Designing affordable housing on odd urban lots in LA

"Misfit parcels" could be the key to providing more affordable housing in Los Angeles, say two experienced multifamily housing designers.

Multifamily Housing | Aug 16, 2020

TCA Architects specifies Engineered Floors products for 304-unit apartment complex in Tracy, Calif.

TCA Architects specified Lewis Rigid Stone Polymer floating plank and Lewis Gold 100% Solution-Dyed high-performance fiber carpet for Harvest in Tracy, Calif.

Multifamily Housing | Aug 3, 2020

71-unit 100% affordable housing development breaks ground in Mountain View, Calif.

Van Meter Williams Pollack is designing the project.

Multifamily Housing | Aug 2, 2020

Stantec-designed 17 West mixed-use development completed in Miami Beach

Stantec-designed 17 West mixed-use development completed, with first Trader Joe's in Miami Beach.

Multifamily Housing | Jul 31, 2020

Railings manufacturer VistaPro launches its new website

VistaPro Architectural Railing Solutions launches new website.

Multifamily Housing | Jul 29, 2020

Multifamily construction proposal activity sees modest rebound in Q2 2020

Among the firms that work in the multifamily sector, 31% said that proposal activity increased in the second quarter, while 24% said it decreased.

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021