flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Preservation lawsuit over Chicago's Prentice Hospital dropped

Preservation lawsuit over Chicago's Prentice Hospital dropped

Legal hurdle cleared for demolition of iconic modernist structure 


By BD+C Staff | February 15, 2013
End of preservation suit allows demolition of iconic modernist structure.
With end of a preservation lawsuit, demolition of iconic modernist structure will proceed.

The National Trust for Historic Preservation and Landmarks Illinois have dropped a lawsuit alleging that the city of Chicago improperly denied landmark status to Prentice Women's Hospital, an iconic modernist structure designed in the 1970s by Bertrand Goldberg. Owner Northwestern University will now be free to go forward with its plan to build a major new biomedical research facility on the downtown site.

The Prentice demolition has been under dispute for several years, as preservation enthusiasts attempted to make the case that the building, with its quatrefoil concrete shell cantilevered over a narrow core, was worth saving. Last November, in contentious proceedings, the Commission on Chicago Landmarks granted the building landmark status and then removed the designation on the same day.

After a hearing in Cook County Circuit Court, the preservation groups decided not to proceed. "We continue to believe there were significant flaws with the process that granted and then removed landmark protection for Prentice," said the National Trust in an official statement. "However, we feel that the landmarks process has run its course."

National Trust Field Officer Christina Morris said the groups will continue to cooperate with the city on preservation of historic structures, and that the Prentice situation has brought important attention to the role of modernist architecture in the U.S. “We will continue to work with our partners to preserve the best of Chicago’s architectural heritage.”

(http://www.chicagotribune.com/news/local/breaking/chi-lawsuit-dropped-over-prentice-preservation-20130214,0,3552305.story)

Related Stories

Smart Buildings | Oct 26, 2020

World’s first smart building assessment and rating program released

The SPIRE Smart Building Program will help building owners and operators make better investment decisions, improve tenant satisfaction, and increase asset value.

Building Team Awards | Oct 22, 2020

Judging a book by its cover

The New York Presbyterian David H. Koch Center wins a Silver Award in BD+C’s 2020 Building Team Awards.

Building Team Awards | Oct 20, 2020

Seamless speed to market drives Texas hospital’s growth

Learn why the Methodist Richardson Medical Center Vertical Expansion, in Richardson, Texas, was honored with a Gold Award in the 2020 Building Team Awards.

Healthcare Facilities | Oct 2, 2020

Healthcare Design Awards promote projects that heal

Awards program highlights trends in healthcare facility designs.

University Buildings | Sep 16, 2020

A new interprofessional hub opens on U. Minnesota’s campus

The Health Sciences Education Center includes two floors for simulation and immersive training.

Healthcare Facilities | Sep 16, 2020

New Foster + Partners-designed hospital begins construction in Cairo

The project focuses on natural light, greenery, and views of the outside.

Healthcare Facilities | Sep 10, 2020

Easing the oncology journey: The role of urgent care

Oncology patients are better served when they’re connected to the right staff.

Giants 400 | Aug 28, 2020

2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms

The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.

Healthcare Facilities | Aug 27, 2020

A hospital addition in Maryland was designed and built in 120 days

Lean practices, and early engagement with the county’s permitting department, moved this project forward quickly.

Building Team | Aug 21, 2020

A healthcare project in Wisconsin benefits from including MEP subs in early design discussions

Prefabrication played a major role in quickening construction.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


Healthcare Facilities

U.S. healthcare building sector trends and innovations for 2024-2025

As new medicines, treatment regimens, and clinical protocols radically alter the medical world, facilities and building environments in which they take form are similarly evolving rapidly. Innovations and trends related to products, materials, assemblies, and building systems for the U.S. healthcare building sector have opened new avenues for better care delivery. Discussions with leading healthcare architecture, engineering, and construction (AEC) firms and owners-operators offer insights into some of the most promising directions. This course is worth 1.0 AIA/HSW learning unit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021