Prefab payback: Mortenson quantifies cost and schedule savings from prefabrication techniques

Prefab payback: Mortenson quantifies cost and schedule savings from prefabrication techniques

Value-based cost-benefit analysis of prefab approaches on the firm's 360-bed Exempla Saint Joseph Heritage Project shows significant savings for the Building Team. 


By Mortenson Construction | May 14, 2014
The contractor implemented advanced prefabrication measures on the 360-bed Exemp
The contractor implemented advanced prefabrication measures on the 360-bed Exempla Saint Joseph Heritage Project in Denver, incl

When Mortenson was charged with the 831,000-sf, 360-bed Exempla Saint Joseph Heritage Project in Denver, we found that a traditional, on-site linear building approach would have resulted in a schedule that did not meet the customer's needs. 

To address the challenge, we leveraged prefabrication across all applicable components in the facility.

Below is an executive summary (the full report will be released soon) of the results from value-based cost-benefit analyses performed during this project on the most significant performance drivers for prefab (schedule, cost, and safety).

We are pleased to share these results with owners who are considering the merits and challenges of prefab, and we invite you to sign-up to be alerted when the full research report is available.

 

Related Stories

| Jun 8, 2012

Living Building Challenge wins the 2012 Buckminster Fuller Challenge

The Living Building Challenge was chosen from a pool of 122 of entries from around the world.

| Jun 8, 2012

Nauset Construction completing sustainable dorm for Brooks School

Student input on green elements provides learning experience.

| Jun 8, 2012

Skyline Construction names Millitello president

Millitello is a 31-year veteran who has overseen the construction of campus-size projects.

| Jun 8, 2012

Allsteel names Kris Yates to head architectural products group

Yates is responsible for the start up, launch and ongoing sales and marketing of Allsteel’s new Beyond movable walls.

| Jun 8, 2012

Chestnut Hill College dedicates Jack and Rosemary Murphy Gulati complex

Casaccio Yu Architects designed the 11,300-sf fitness and social complex.

| Jun 7, 2012

Waterline exhibition displays visions for re-thinking the Chicago River

The designs of Waterline showcase why the Chicago River should once again be considered the city’s most important asset and sets the stage for increased awareness, education and reinvention of the River.

| Jun 7, 2012

WDMA and FMA to affiliate and integrate operations

Over the coming months both organizations will begin the process of formalizing the details of the agreement for final approval by both organizations, with the formal change expected to take effect in January 2015.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021