A new Montessori school in Drøbak, Norway is one of the latest projects completed by a coalition of architects, engineers, and developers called Powerhouse that is constructing energy-positive buildings.
Their goal is to construct buildings that provide more power over the course of their lifetimes than they cost to build, run and demolish. Powerhouse members are architecture firm Snøhetta, Entra and Asplan Viak, two real estate companies, and Zero Emission Resource Organization (ZERO), a non-profit foundation.
The Norwegian school features solar panels and geothermal wells. The design has to change from “form follows function” to “form follows environment,” says one Powerhouse member.
So far, Powerhouse has retrofitted one building in addition to the school, and is constructing its first purpose-built office building. Other groups are building energy-positive buildings, but none have taken the full life-cycle approach, accounting for construction and demolition, as Powerhouse does.
Related Stories
Codes and Standards | Apr 23, 2020
COVID-19 epidemic demonstrates value of flexible hospital space
Some rooms being repurposed for ICU care.
Codes and Standards | Apr 15, 2020
Embodied carbon footprint can be reduced by using conventional materials
High-SCM concrete, and cellulose and wood fiber insulation among the greener alternatives.
Coronavirus | Apr 13, 2020
COVID-19 alert: City conducts a 'virtual building inspection' to allow Starbucks and bank to open
Bothell, Wash., issues a certificate of occupancy to developer after inspecting the property online.
Codes and Standards | Apr 13, 2020
Design competition focuses on reducing urban heat island effect
Cool Abu Dhabi aims to transform urban life in the Middle East.
Codes and Standards | Apr 13, 2020
What building science says about reducing COVID-19 transmission
Impact of temperature and relative humidity is unclear.
Codes and Standards | Apr 9, 2020
Owners retrofitting properties, monitoring performance during epidemic
Covid-19 outbreak may lead employers to reevaluate office commitments.
Codes and Standards | Apr 7, 2020
Dept. of Labor publishes guidance on paid sick leave, expanded family and medical leave
Includes fact sheets for employees, employers, and a questions and answers document.
Codes and Standards | Apr 1, 2020
Standards and codes meetings halted, postponed
ASTM International cancels in-person standards meetings; DOE’s National Energy Codes Conference postponed.
Codes and Standards | Mar 26, 2020
Ransomware attack on Canadian contractor underscores need for cybersecurity
Victimized company Bird Construction has defense, law enforcement contracts.
Codes and Standards | Mar 23, 2020
Contractors should scrutinize contracts carefully amid Covid-19 crisis
Compliance with time-sensitive notice requirements and careful documentation required.