flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Post Tower Wins CTBUH 10-Year Award

Post Tower Wins CTBUH 10-Year Award

Completed in 2002, the Post Tower blazed new trails by using technically integrated design to deliver high performance. 


By Council on Tall Buildings | July 28, 2014
Post Tower, a 163-meter office tower in Bonn, Germany, has received the 10 Year Award from the Council on Tall Buildings and Urban Habitat (CTBUH).
 
The 10 Year Award recognizes proven value and performance in a tall building, across one or more of a wide range of criteria, over a period of 10 years since its completion. This award gives an opportunity to reflect back on buildings that have been completed and operational for at least a decade, and acknowledge those projects which have performed successfully, long after the ribbon-cutting ceremonies have passed. 
 
Completed in 2002, the Post Tower blazed new trails by using technically integrated design to deliver high performance. Its two elliptical volumes, with an atrium between, work together with site and wind orientation, a double-skin, operable façade, and stack ventilation to remove much of the need for mechanical ventilation commonly found in large buildings. This not only allows the building to consume only 75 kilowatt-hours per square meter per year, which is 79 percent less energy than a typical office building of its size; it also makes for pleasant interior sky garden spaces and a more efficient floor plate. 
 
“The Post Tower was an early touchstone for sustainable tower design and has provided a very useful model through its attention to performance,” said Awards Jury Chair Jeanne Gang, founding principal, Studio Gang Architects. “The jury was impressed with the continued monitoring and proof of concept.”
 
“The Post Tower undoubtedly changes the way we look at sustainable building for the high rise typology,” said Awards juror David Gianotten, managing director, Office for Metropolitan Architecture (OMA). “The design single-handedly changed the way we look at façade and office design to date. It has become an exemplar sustainable icon in contemporary architecture.”
 
The other 10 Year Finalists considered for this Award were:
• Taipei 101, Taiwan, China
• Torre Agbar, Barcelona, Spain
• Uptown Munchen, Munich, Germany
• Highlight Towers, Munich, Germany 
• Time Warner Center, New York City, United States 
• Bloomberg Tower, New York City, United States 
• Tower Palace Three, Seoul, South Korea
 
All award winners, including the 2014 Best Tall Building Winners and Finalists, will be recognized at the CTBUH 13th Annual Awards Symposium, which will take place at the Illinois Institute of Technology, Chicago, on November 6. The symposium will be followed by the Awards Ceremony and Dinner in the iconic Crown Hall, designed by Mies van der Rohe. Click here to see the previously announced 2014 regional Best Tall Building award winners, here to see the 2014 Urban Habitat award winner and finalist, here to see the 2014 Tall Building Innovation Award winner and finalist, and here to see the 2014 Performance Award winner and finalist.
 
The CTBUH Awards are an independent review of new projects, judged by a panel of industry experts. Projects are recognized for making an extraordinary contribution to the advancement of tall buildings and the urban environment, and for achieving sustainability at the broadest level.
 
Winners and finalists are featured in the annual CTBUH Awards Book, which is published in conjunction with a major global publisher and distributed internationally each year.

Related Stories

| Dec 17, 2010

ARRA-funded Navy hospital aims for LEED Gold

The team of Clark/McCarthy, HKS Architects, and Wingler & Sharp are collaborating on the design of a new naval hospital at Camp Pendleton in Southern California. The $451 million project is the largest so far awarded by the U.S. Navy under the American Recovery and Reinvestment Act. The 500,000-sf, 67-bed hospital, to be located on a 70-acre site, will include facilities for emergency and primary care, specialty care clinics, surgery, and intensive care. The Building Team is targeting LEED Gold.

| Dec 17, 2010

Arizona outpatient cancer center to light a ‘lantern of hope’

Construction of the Banner MD Anderson Cancer Center in Gilbert, Ariz., is under way. Located on the Banner Gateway Medical Center campus near Phoenix, the three-story, 131,000-sf outpatient facility will house radiation oncology, outpatient imaging, multi-specialty clinics, infusion therapy, and various support services. Cannon Design incorporated a signature architectural feature called the “lantern of hope” for the $90 million facility.

| Dec 17, 2010

Cladding Do’s and Don’ts

A veteran structural engineer offers expert advice on how to avoid problems with stone cladding and glass/aluminum cladding systems.

| Dec 17, 2010

5 Tips on Building with SIPs

Structural insulated panels are gaining the attention of Building Teams interested in achieving high-performance building envelopes in commercial, industrial, and institutional projects.

| Dec 17, 2010

How to Win More University Projects

University architects representing four prominent institutions of higher learning tell how your firm can get the inside track on major projects.

| Dec 13, 2010

Energy efficiency No. 1 priority for commercial office tenants

Green building initiatives are a key influencer when tenants decide to sign a commercial real estate lease, according to a survey by GE Capital Real Estate. The survey, which was conducted over the past year and included more than 2,220 office tenants in the U.S., Canada, France, Germany, Sweden, the UK, Spain, and Japan, shows that energy efficiency remains the No. 1 priority in most countries. Also ranking near the top: waste reduction programs and indoor air.

| Dec 7, 2010

Are green building RFPs more important than contracts?

The Request for Proposal (RFP) process is key to managing a successful LEED project, according to Green Building Law Update. While most people think a contract is the key element to a successful construction project, successfully managing a LEED project requires a clear RFP that addresses many of the problems that can lead to litigation.

| Dec 7, 2010

Blue is the future of green design

Blue design creates places that are not just neutral, but actually add back to the world and is the future of sustainable design and architecture, according to an interview with Paul Eagle, managing director of Perkins+Will, New York; and Janice Barnes, principal at the firm and global discipline leader for planning and strategies.

| Dec 7, 2010

Green building thrives in shaky economy

Green building’s momentum hasn’t been stopped by the economic recession and will keep speeding through the recovery, while at the same time building owners are looking to go green more for economic reasons than environmental ones. Green building has grown 50% in the past two years; total construction starts have shrunk 26% over the same time period, according to “Green Outlook 2011” report. The green-building sector is expected to nearly triple by 2015, representing as much as $145 billion in new construction activity.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021