flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Post Tower Wins CTBUH 10-Year Award

Post Tower Wins CTBUH 10-Year Award

Completed in 2002, the Post Tower blazed new trails by using technically integrated design to deliver high performance. 


By Council on Tall Buildings | July 28, 2014
Post Tower, a 163-meter office tower in Bonn, Germany, has received the 10 Year Award from the Council on Tall Buildings and Urban Habitat (CTBUH).
 
The 10 Year Award recognizes proven value and performance in a tall building, across one or more of a wide range of criteria, over a period of 10 years since its completion. This award gives an opportunity to reflect back on buildings that have been completed and operational for at least a decade, and acknowledge those projects which have performed successfully, long after the ribbon-cutting ceremonies have passed. 
 
Completed in 2002, the Post Tower blazed new trails by using technically integrated design to deliver high performance. Its two elliptical volumes, with an atrium between, work together with site and wind orientation, a double-skin, operable façade, and stack ventilation to remove much of the need for mechanical ventilation commonly found in large buildings. This not only allows the building to consume only 75 kilowatt-hours per square meter per year, which is 79 percent less energy than a typical office building of its size; it also makes for pleasant interior sky garden spaces and a more efficient floor plate. 
 
“The Post Tower was an early touchstone for sustainable tower design and has provided a very useful model through its attention to performance,” said Awards Jury Chair Jeanne Gang, founding principal, Studio Gang Architects. “The jury was impressed with the continued monitoring and proof of concept.”
 
“The Post Tower undoubtedly changes the way we look at sustainable building for the high rise typology,” said Awards juror David Gianotten, managing director, Office for Metropolitan Architecture (OMA). “The design single-handedly changed the way we look at façade and office design to date. It has become an exemplar sustainable icon in contemporary architecture.”
 
The other 10 Year Finalists considered for this Award were:
• Taipei 101, Taiwan, China
• Torre Agbar, Barcelona, Spain
• Uptown Munchen, Munich, Germany
• Highlight Towers, Munich, Germany 
• Time Warner Center, New York City, United States 
• Bloomberg Tower, New York City, United States 
• Tower Palace Three, Seoul, South Korea
 
All award winners, including the 2014 Best Tall Building Winners and Finalists, will be recognized at the CTBUH 13th Annual Awards Symposium, which will take place at the Illinois Institute of Technology, Chicago, on November 6. The symposium will be followed by the Awards Ceremony and Dinner in the iconic Crown Hall, designed by Mies van der Rohe. Click here to see the previously announced 2014 regional Best Tall Building award winners, here to see the 2014 Urban Habitat award winner and finalist, here to see the 2014 Tall Building Innovation Award winner and finalist, and here to see the 2014 Performance Award winner and finalist.
 
The CTBUH Awards are an independent review of new projects, judged by a panel of industry experts. Projects are recognized for making an extraordinary contribution to the advancement of tall buildings and the urban environment, and for achieving sustainability at the broadest level.
 
Winners and finalists are featured in the annual CTBUH Awards Book, which is published in conjunction with a major global publisher and distributed internationally each year.

Related Stories

| Apr 13, 2011

Duke University parking garage driven to LEED certification

People parking their cars inside the new Research Drive garage at Duke University are making history—they’re utilizing the country’s first freestanding LEED-certified parking structure.

| Apr 13, 2011

Red Bull Canada HQ a mix of fluid spaces and high-energy design

The Toronto architecture firm Johnson Chou likes to put a twist on its pared-down interiors, and its work on the headquarters for Red Bull Canada is no exception. The energy drink maker occupies 12,300 sf on the top two floors of a three-story industrial building in Toronto, and the design strategy for its space called for leaving the base building virtually untouched while attention was turned to the interior architecture.

| Apr 13, 2011

Former department store gets new lease on life as MaineHealth HQ

The long-vacant Sears Roebuck building in Portland, Maine, was redeveloped into the corporate headquarters for MaineHealth. Consigli Construction and local firm Harriman Architects + Engineers handled the 14-month fast-track project, transforming the 89,000-sf, four-story facility for just $100/sf.

| Apr 12, 2011

Rutgers students offered choice of food and dining facilities

The Livingston Dining Commons at Rutgers University’s Livingston Campus in New Brunswick, N.J., was designed by Biber Partnership, Summit, N.J., to offer three different dining rooms that connect to a central servery.

| Apr 12, 2011

Retail complex enjoys prime Abu Dhabi location

The Galleria at Sowwah Square in Abu Dhabi will be built in a prime location within Sowwah Island that also includes a five-star Four Seasons Hotel, the healthcare facility Cleveland Clinic Abu Dhabi, and nearly two million sf of Class A office space.

| Apr 12, 2011

Luxury New York high rise adjacent to the High Line

Located adjacent to New York City’s High Line Park, 500 West 23rd Street will offer 111 luxury rental apartments when it opens later this year.

| Apr 12, 2011

College of New Jersey facility will teach teachers how to teach

The College of New Jersey broke ground on its 79,000-sf School of Education building in Ewing, N.J.

| Apr 12, 2011

Mental hospital in Boston redeveloped as healthcare complex

An abandoned state mental health facility in Boston’s prestigious Longwood Medical Area is being transformed into the Mass Mental Health Center, a four-building mixed-use complex that includes a mental health day hospital, a clinical and office building, a medical research facility for Brigham and Women’s Hospital, and a residential facility.

| Apr 12, 2011

Miami courthouse design does justice to children and the environment

Suffolk Construction broke ground recently for the Miami-Dade County Children’s Courthouse, a $328 million project the firm has a 30-month contract to complete.

| Apr 12, 2011

Long-awaited San Francisco center is music to jazz organization’s ears

After 28 years, SFJAZZ is getting its first permanent home. The San Francisco-based nonprofit, which is dedicated to advancing the art of jazz through concerts and educational programs, contracted local design firm Mark Cavagnero Associates and general contractor Hathaway Dinwiddie to create a modern performance center in the city’s Hayes Valley neighborhood

boombox1
boombox2
native1

More In Category


Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021