flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Post-tornado, Tuscaloosa seeks to create walkable urban, retail areas

Post-tornado, Tuscaloosa seeks to create walkable urban, retail areas

Block sizes initially were limited to a maximum perimeter of 1,750 feet, with no side of the block being longer than 500 feet.


By By BD+C Staff | December 15, 2011
Block sizes initially were limited to a maximum perimeter of 1,750 feet, with no side of the block being longer than 500 feet.

The Tuscaloosa, Ala. City Council's proposed set of new building and design codes in the tornado recovery zone include a measure aimed at establishing pedestrian-friendly urban and retail areas.

Block sizes initially were limited to a maximum perimeter of 1,750 feet, with no side of the block being longer than 500 feet, but the limit has been enlarged to a perimeter of 2,000 feet with a maximum side of 600 feet. Tuscaloosa was devastated by a tornado in April.

Click here to read more about Tuscaloosa's building codes. BD+C

Related Stories

| Jan 18, 2012

Death in Chicago high-rise apartment fire blamed on fire code

The death of a Chicago woman who stepped off her elevator into a blazing inferno last week has underscored the need for fire sensors in elevators.

| Jan 18, 2012

California approves open cell spray foam for energy efficiency standards

The California Energy Commission (CEC) now recognizes open-cell spray foam as an accepted insulation in its 2008 Building Energy Efficiency Standards.

| Jan 5, 2012

Building to LEED standards now an 'easy call' from cost standpoint

Once seen as a cost burden, building to LEED standards is now an "easy call," according to Dan Probst, chairman of energy and sustainability for real estate management and development firm Jones Lang LaSalle.

| Jan 5, 2012

Minnesota's GreenStep Cities program aids communities in winning grants

GreenStep Cities, a Minnesota initiative, was designed to provide greater recognition to the state's communities for achievements in meeting sustainability standards and goals.

| Jan 5, 2012

Some ADA accessibility rules change in 2012

Some changes to the Americans with Disabilities Act go into effect beginning March 15, 2012.

| Jan 5, 2012

Ontario's stringent energy code has builders concerned over indoor air quality

Some Ontario builders are worried that new building code requirements with stricter energy efficiency measures could lead to poor indoor air quality.

| Jan 5, 2012

New law bars Defense Department from new LEED certifications

The Defense Department will not be allowed to use any money to certify its buildings LEED Gold or Platinum, under a law President Obama signed Dec. 31.

| Jan 5, 2012

Some ADA accessibility rules change in 2012

Some changes to the Americans with Disabilities Act go into effect beginning March 15, 2012.

| Jan 3, 2012

New SJI Rule on Steel Joists

A new rule from the Steel Joist Institute clarifies when local reinforcement of joists is required for chord loads away from panel points. SJI members offer guidance about how and when to specify loads.

| Dec 29, 2011

OSHA enforcing new fall hazard standards

OSHA is enforcing its new fall protection standards, as evidenced by a recent crackdown in New York.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021