flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Political will, tougher standards needed to reach carbon neutral goal

Codes and Standards

Political will, tougher standards needed to reach carbon neutral goal

Stretch codes, more stringent credentials for designers, contractors, and inspectors may be needed.


By Peter Fabris, Contributing Editor | October 2, 2018

After 19 cities signed a declaration to make all new buildings carbon neutral by 2030, the question is: How will they get there?

Part of the answer will come down to political will to withstand expected opposition from developers. To reach net-zero carbon, energy usage of buildings will have to be cut anywhere from 50% to 85%.

Stretch codes, an extra layer of local, more stringent regulations on top of the base building codes, could be used. More stringent credentials for designers, contractors, and inspectors, may also be needed.

The 2030 goal is feasible, according to an official with the Alliance to Save Energy. One example is Melbourne, Australia’s Pixel Building, the country’s first carbon-neutral building. It features colorful panels that control the amount of light coming into the building, and smart windows that allow heat to escape.

Related Stories

Codes and Standards | Jul 30, 2020

Institute for Market Transformation acquires Energy-Efficient Codes Coalition

Goal is to achieve net-zero construction by 2050.

Codes and Standards | Jul 29, 2020

Crackdowns grow on construction firms that fail to follow COVID-19 guidelines

States, cities, and OSHA enforce social distancing, hand-washing regulations.

Codes and Standards | Jul 28, 2020

California utility adopts climate emergency declaration

Sacramento-region company commits to working towards carbon neutrality by 2030.

Codes and Standards | Jul 23, 2020

North Carolina will stop relying on FEMA flood mapping

State will identify flood zones on its own.

Codes and Standards | Jul 22, 2020

New version of IAPMO’s Water Demand Calculator is available

Enhanced features include selection between single- and multifamily buildings.

Codes and Standards | Jul 22, 2020

Mobile app calculates sound transmission for wood-framed assemblies

American Wood Council tool for floor-ceiling assemblies.

Codes and Standards | Jul 22, 2020

Architecture billings remain in negative territory, begin to stabilize

Fewer architecture firms report declining billings this month.

Codes and Standards | Jul 20, 2020

N.Y. construction firm to pay $1.5 million to settle sexual harassment claim

Managers said to demand sex for pay and OT opportunities.

Codes and Standards | Jul 16, 2020

Tips to make optimal use of salvaged materials

Integrated teams, staging warehouse, and looking early and often, among recommendations.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021