flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Political will, tougher standards needed to reach carbon neutral goal

Codes and Standards

Political will, tougher standards needed to reach carbon neutral goal

Stretch codes, more stringent credentials for designers, contractors, and inspectors may be needed.


By Peter Fabris, Contributing Editor | October 2, 2018

After 19 cities signed a declaration to make all new buildings carbon neutral by 2030, the question is: How will they get there?

Part of the answer will come down to political will to withstand expected opposition from developers. To reach net-zero carbon, energy usage of buildings will have to be cut anywhere from 50% to 85%.

Stretch codes, an extra layer of local, more stringent regulations on top of the base building codes, could be used. More stringent credentials for designers, contractors, and inspectors, may also be needed.

The 2030 goal is feasible, according to an official with the Alliance to Save Energy. One example is Melbourne, Australia’s Pixel Building, the country’s first carbon-neutral building. It features colorful panels that control the amount of light coming into the building, and smart windows that allow heat to escape.

Related Stories

| Mar 1, 2012

California bill aims to cut costs for commercial building energy retrofits

A bill in the California Assembly would allow the state to pool together property owners’ energy-retrofit loans.

| Feb 29, 2012

Carvalho appointed Shawmut Safety Director

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system. 

| Feb 23, 2012

Federal budget cuts put major building projects on hold

A plan to build the National Bio and Agro-Defense Facility in Kansas is among several major building projects in jeopardy after the Obama administration’s 2013 budget was unveiled. The budget would cut all construction spending for the facility.

| Feb 23, 2012

Federal agencies fixed on leasing LEED-certified space

The federal government is especially focused on renting LEED-certified spaces.

| Feb 23, 2012

Regulators investigating construction accident at World Trade Center

The New York Port Authority and the city’s fire and building departments are investigating an accident at the World Trade Center construction site in lower Manhattan after a crane dropped steel beams that fell about 40 stories onto the truck that delivered them.

| Feb 23, 2012

New Virginia statewide building code goes into effect March 1

After March 1, all building plans in Virginia must adhere to the 2009 code that was adopted a year ago.

| Feb 23, 2012

Privatizing flood insurance could lead to new code requirements

One thing that could pave the way toward private flood insurance would be NFIP reforms, like requiring new construction in flood-prone areas to be elevated.

| Feb 22, 2012

ACI BIM manual for cast-in-place concrete in development

The improved communication, coordination, and collaboration afforded by BIM implementation have already been shown to save time and money in projects.

boombox1
boombox2
native1

More In Category




Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021