flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Political will, tougher standards needed to reach carbon neutral goal

Codes and Standards

Political will, tougher standards needed to reach carbon neutral goal

Stretch codes, more stringent credentials for designers, contractors, and inspectors may be needed.


By Peter Fabris, Contributing Editor | October 2, 2018

After 19 cities signed a declaration to make all new buildings carbon neutral by 2030, the question is: How will they get there?

Part of the answer will come down to political will to withstand expected opposition from developers. To reach net-zero carbon, energy usage of buildings will have to be cut anywhere from 50% to 85%.

Stretch codes, an extra layer of local, more stringent regulations on top of the base building codes, could be used. More stringent credentials for designers, contractors, and inspectors, may also be needed.

The 2030 goal is feasible, according to an official with the Alliance to Save Energy. One example is Melbourne, Australia’s Pixel Building, the country’s first carbon-neutral building. It features colorful panels that control the amount of light coming into the building, and smart windows that allow heat to escape.

Related Stories

| Oct 11, 2012

OSHA launches pilot program for alternative dispute resolution on whistleblower complaints

The Occupational Safety and Health Administration (OSHA) is launching an alternative dispute resolution (ADR) pilot program for complaints filed with OSHA's Whistleblower Protection Program.

| Oct 11, 2012

Bill promotes investment in commercial, multifamily retrofits

The Commercial Building Modernization Act recently introduced in the Senate would extend and streamline a current tax deduction to encourage commercial and multifamily residential building owners to perform comprehensive energy-efficient retrofits.

| Oct 11, 2012

Morristown, N.Y., settles code violation dispute with Amish

The town of Morristown, N.Y., has dropped charges of building code violations against local Amish communities to settle a First Amendment complaint.

| Oct 11, 2012

Mesquite, Nev., rebels against state-mandated energy code

The city council of Mesquite, Nev., voted against adopting a new energy efficiency code adopted by the state.

| Oct 11, 2012

Bloomingdale, N.J., restricts ground solar and wind energy installations

The borough of Bloomingdale, N.J., recently adopted regulations for solar-energy and wind energy systems.

| Oct 3, 2012

Bill introduced to extend home energy efficiency tax credit

A bill to extend the expired residential energy efficiency tax credit for installing qualified furnaces, boilers, central air conditioners, and heat pumps was recently filed in the U.S. House of Representatives.

| Oct 3, 2012

OSHA publishes more detailed information on variances

The Occupational Safety and Health Administration (OSHA) enhanced its variances Web page to improve public understanding of the variance approval process and increase access to the agency's decisions regarding variance requests.

| Oct 3, 2012

Online program computes energy savings from green roofs; compares savings with other options

A free online tool can calculate the amount of energy savings from installation of a green roof. Portland State University‘s (PSU’s) online Green Roof Energy Calculator can be used for new or old structures.

boombox1
boombox2
native1

More In Category




Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021