After 19 cities signed a declaration to make all new buildings carbon neutral by 2030, the question is: How will they get there?
Part of the answer will come down to political will to withstand expected opposition from developers. To reach net-zero carbon, energy usage of buildings will have to be cut anywhere from 50% to 85%.
Stretch codes, an extra layer of local, more stringent regulations on top of the base building codes, could be used. More stringent credentials for designers, contractors, and inspectors, may also be needed.
The 2030 goal is feasible, according to an official with the Alliance to Save Energy. One example is Melbourne, Australia’s Pixel Building, the country’s first carbon-neutral building. It features colorful panels that control the amount of light coming into the building, and smart windows that allow heat to escape.
Related Stories
Codes and Standards | May 30, 2018
Silicon Valley cities considering taxes aimed at large employers
The aim is to offset the impact on housing costs and homelessness by tech companies.
Codes and Standards | May 30, 2018
OSHA proposes new crane operator safety rule
Would provide long-term clarity on certification requirements.
Codes and Standards | May 29, 2018
Government support helping to drive demand for green building materials
Market projects to grow 12.5% annually between 2013 and 2019.
Codes and Standards | May 24, 2018
‘Amazon tax’ could slow Seattle’s construction boom
City imposes employer head count tax to fund affordable housing.
Codes and Standards | May 23, 2018
AAMA releases 2017/2018 fenestration market studies
Offers forecasts of industry trends.
Codes and Standards | May 22, 2018
Registration open for 2018 National Energy Codes Conference
U.S. Department of Energy event to be held July 15th-17th in Austin.
Codes and Standards | May 21, 2018
New standard tests quietness of floors
ASTM International method will help manufacturers test their flooring materials.
Codes and Standards | May 17, 2018
California will require solar panels on most new homes
Projected to add $10,000 to cost of new homes.
Codes and Standards | May 16, 2018
New resources offer tips on off-site construction
NIBS documents address using pre-cast concrete, and commercial and legal considerations of modular construction.
Codes and Standards | May 15, 2018
Blast testing of loaded mass timber structures yields positive results
Four tests covered a spectrum of blast loads.