flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

PNC Bank’s 'Tiny Branch' opens on West Virginia University campus

Modular Building

PNC Bank’s 'Tiny Branch' opens on West Virginia University campus

The new branch doesn’t need much space for its ATM and new accounts and personal loans services.


By Mike Chamernik, Associate Editor | July 22, 2016

PNC Bank’s 110-sf “Tiny Branch." Photos courtesy PNC. Click here to enlarge.

With no lines and financial consultants equipped with iPads, the new PNC location on the campus of West Virginia University in Morgantown isn’t the typical bank. 

And that’s not even taking into account its size. The entire bank only has 110 sf of usable space, plus room for a smart ATM.

The "Tiny Branch", a 8x20-foot steel container, was shipped on a flatbed truck and set up in just six hours from the time of its delivery. It was introduced this week.

According to PNC, the location will focus on self-service banking. Consultants will also be on hand to assist customers with new accounts and personal loans. An Instant Card Issuance Printer on site will supply debit and check cards.

“Branch convenience to home remains the number one consideration when consumers choose their primary bank,” said Jim Balouris, Southwest Pa. Market Manager, PNC Bank, in a statement. “This tiny branch is like a pop-up installation. It is a fun, creative way to bring a host of services that help customers discover ways to enhance their financial wellbeing.”

PNC says that 56% of its customers use non-branch banking services like online, mobile and ATM for the majority of their transactions.

 

PNC Bank branch manager Connie Spires stands inside the tiny branch.

The 8x20-foot steel container was shipped to the site on July 19. It took only six hours to set up.

Related Stories

AEC Innovators | Aug 13, 2019

Stacking the deck: Marriott International embraces modular construction

The hotel giant has more than 50 projects in the works that incorporate prefab guestrooms or bathrooms.

Modular Building | Jul 3, 2019

World’s tallest modular building rises in Singapore

The state has been pushing for improvements in construction management.

Modular Building | May 13, 2019

This Marriott is poised to take over the title as the world’s tallest modular hotel

Danny Forster & Architecture designed the building.

Sponsored | Modular Building | Jan 22, 2019

Folsom Hotel opens five months early using modular construction

Early check in? With modular construction the answer is yes!

Modular Building | Oct 31, 2018

Europe’s citizenM is trying to crack into the U.S. hotel market with steel-framed modular construction

Projects in several cities are in various stages of development.

Modular Building | Oct 12, 2018

DeSimone Consulting Engineers designs the tallest modular hotel in the United States

The hotel was originally designed as a cast-in-place concrete structure.

Modular Building | Sep 25, 2018

Amazon invests in a prefab module supplier

Los Angeles-based Plant Prefab targets single- and multifamily construction.

Modular Building | Aug 6, 2018

More contractors are turning to offsite production for speed and quality

Skender launches an advanced manufacturing division. Katerra ups its bet on modular. Prefabrication comes to the rescue on multiple projects.

Modular Building | Jul 23, 2018

Offsite construction: Why it’s important for the survival of your firm

The industry is approaching its “heart attack moment,” with so many large projects that are chronically late, over budget, and unprofitable, writes FMI Capital Advisors’ Michael Swistun.

boombox1
boombox2
native1

More In Category

Contractors

Contractors expect to spend more time on prefabrication, according to FMI study

Get ready for a surge in prefabrication activity by contractors. FMI, the consulting and investment banking firm, recently polled contractors about how much time they were spending, in craft labor hours, on prefabrication for construction projects. More than 250 contractors participated in the survey, and the average response to that question was 18%. More revealing, however, was the participants’ anticipation that craft hours dedicated to prefab would essentially double, to 34%, within the next five years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021