flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Plumosa School of the Arts earns LEED Gold

Plumosa School of the Arts earns LEED Gold

Education project dedicated to teaching sustainability in the classroom.


By Posted by Tim Gregorski, Senior Editor | July 2, 2012
Plumosa School of the Arts has been awarded LEED Gold by the USGBC.
Plumosa School of the Arts has been awarded LEED Gold by the USGBC.

Suffolk Construction announced that Plumosa School of the Arts has been awarded LEED Gold by the USGBC. 

Plumosa, located in Delray Beach, is one of the first elementary schools in South Florida with a dedicated curriculum for the Arts. The project built for the School District of Palm Beach County, included the renovation and addition to the existing Atlantic High School campus. The new 92,000-sf 704-station elementary school included extensive modernization and preservation planning of the 640-seat auditorium.

During the project planning and design stages, the School District had mandated all projects moving forward would be required to apply for LEED Silver. Suffolk Construction, along with the design team of Tercilla Courtemanche Architects, reviewed the project and the traditional USGBC point system for opportunities to create sustainable strategies for the project. Some of the elements implemented included low-flow plumbing and motion light sensors throughout reducing water usage and creating energy savings. 

Because the project was located on such a large site, the team chose specific indigenous plants and grasses in the landscape that didn’t require irrigation; thus saving water usage. Other areas that increased the project’s performance included that fact it was developed on a Brownfield site; which enabled the use of a site which in the past would have been overlooked. Through shared parking with the adjacent City of Delray Swimming Complex the Project Team minimized adding parking spaces which helps to reduce the island heat effect created from asphalted parking areas.

The project team determined they would ensure the use of regional materials for the project as well as taking advantage of programs such as Renewable Energy Credits and Certified Woods. As a method to prevent increasing wasted materials, the old asphalt that was demolished was re-used.  During the demolition, instead of sending the crushed asphalt to the landfill, they worked with Waste Management to repurpose for base course to stabilize the new parking lots. +

Related Stories

| Dec 7, 2011

Autodesk agrees to acquire Horizontal Systems

Acquisition extends and accelerates cloud-based BIM solutions for collaboration, data, and lifecycle management.

| Dec 7, 2011

ICS Builders and BKSK Architects complete St. Hilda’s House in Manhattan

The facility's design highlights the inherent link between environmental consciousness and religious reverence.

| Dec 6, 2011

Construction industry leaders gather for forum on diversity

Declared a “groundbreaking” event for the industry, Gilbane’s First Annual National Partners Council Forum addressed diversity and inclusion as well as building partnerships with minority, veteran, and women-owned businesses.

| Dec 6, 2011

Mortenson Construction completes Elk Wind Project in Iowa

By the end of 2011, Mortenson will have built 17 wind projects in the state generating a total of 1894 megawatts of renewable power.

| Dec 6, 2011

?ThyssenKrupp acquires Sterling Elevators Services

The acquisition of Sterling Elevator Services Corporation is the third acquisition completed by ThyssenKrupp Elevator AG in the last three months in North America. 

| Dec 6, 2011

Vivenzio named vice president of building performance practice at Thornton Tomasetti’s New York Office

Vivenzio, a licensed architect in New York and New Jersey, has more than 28 years of experience in architectural project management, construction administration, building diagnostic services and forensic investigation.

| Dec 6, 2011

New office building features largest solar panel system in New Orleans

Woodward Design+Build celebrates grand opening of new green headquarters in Central City.

| Dec 5, 2011

New York and San Francisco receive World Green Building Council's Government Leadership Awards

USGBC commends two U.S. cities for their innovation in green building leadership.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Dec 5, 2011

Fraser Brown MacKenna wins Green Gown Award

Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.

boombox1
boombox2
native1

More In Category


Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021