flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Plumosa School of the Arts earns LEED Gold

Plumosa School of the Arts earns LEED Gold

Education project dedicated to teaching sustainability in the classroom.


By Posted by Tim Gregorski, Senior Editor | July 2, 2012
Plumosa School of the Arts has been awarded LEED Gold by the USGBC.
Plumosa School of the Arts has been awarded LEED Gold by the USGBC.

Suffolk Construction announced that Plumosa School of the Arts has been awarded LEED Gold by the USGBC. 

Plumosa, located in Delray Beach, is one of the first elementary schools in South Florida with a dedicated curriculum for the Arts. The project built for the School District of Palm Beach County, included the renovation and addition to the existing Atlantic High School campus. The new 92,000-sf 704-station elementary school included extensive modernization and preservation planning of the 640-seat auditorium.

During the project planning and design stages, the School District had mandated all projects moving forward would be required to apply for LEED Silver. Suffolk Construction, along with the design team of Tercilla Courtemanche Architects, reviewed the project and the traditional USGBC point system for opportunities to create sustainable strategies for the project. Some of the elements implemented included low-flow plumbing and motion light sensors throughout reducing water usage and creating energy savings. 

Because the project was located on such a large site, the team chose specific indigenous plants and grasses in the landscape that didn’t require irrigation; thus saving water usage. Other areas that increased the project’s performance included that fact it was developed on a Brownfield site; which enabled the use of a site which in the past would have been overlooked. Through shared parking with the adjacent City of Delray Swimming Complex the Project Team minimized adding parking spaces which helps to reduce the island heat effect created from asphalted parking areas.

The project team determined they would ensure the use of regional materials for the project as well as taking advantage of programs such as Renewable Energy Credits and Certified Woods. As a method to prevent increasing wasted materials, the old asphalt that was demolished was re-used.  During the demolition, instead of sending the crushed asphalt to the landfill, they worked with Waste Management to repurpose for base course to stabilize the new parking lots. +

Related Stories

| Feb 28, 2012

McCarthy completes second phase of San Diego’s Scripps Hospital

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space. 

| Feb 28, 2012

LUMEnergi names Weinbaum president and CEO

Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.

| Feb 28, 2012

Griffin Electric completes Medical University of South Carolina project

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.

| Feb 27, 2012

Consigli complete first building for Bigelow Ocean Sciences Campus

Designed by WBRC Architects Engineers in association with Perkins + Will.

| Feb 27, 2012

Hollister completes fit-out of 41,500-sf office space in Princeton, N.J.

Intricate interior project involved construction of more than 80 offices.

| Feb 27, 2012

Research Institute at Texas Children’s Hospital building receives LEED Gold

Innovative and sustainable design reflects best environmental building practices.

| Feb 26, 2012

Milwaukee U-Haul facility receives LEED-CI Silver

The new elements of the facility now include: efficient lighting with day-lighting controls and occupancy sensors, a high-efficiency HVAC system used in conjunction with a newly constructed thermal envelope to help reduce energy consumption, and the installation of low-flow fixtures to reduce water consumption.

| Feb 26, 2012

Hollister Construction awarded 42,000-sf office fit-out in Holtsville, N.Y.

Space leased by U.S. General Service Administration.

| Feb 26, 2012

Alvarez-Glasman & Colvin’s Chen LEED certified

Chen works closely with property owners to ensure that their properties meet and exceed all industry standards, and also provide long-term energy savings.

boombox1
boombox2
native1

More In Category


Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021