flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Plumosa School of the Arts earns LEED Gold

Plumosa School of the Arts earns LEED Gold

Education project dedicated to teaching sustainability in the classroom.


By Posted by Tim Gregorski, Senior Editor | July 2, 2012
Plumosa School of the Arts has been awarded LEED Gold by the USGBC.
Plumosa School of the Arts has been awarded LEED Gold by the USGBC.

Suffolk Construction announced that Plumosa School of the Arts has been awarded LEED Gold by the USGBC. 

Plumosa, located in Delray Beach, is one of the first elementary schools in South Florida with a dedicated curriculum for the Arts. The project built for the School District of Palm Beach County, included the renovation and addition to the existing Atlantic High School campus. The new 92,000-sf 704-station elementary school included extensive modernization and preservation planning of the 640-seat auditorium.

During the project planning and design stages, the School District had mandated all projects moving forward would be required to apply for LEED Silver. Suffolk Construction, along with the design team of Tercilla Courtemanche Architects, reviewed the project and the traditional USGBC point system for opportunities to create sustainable strategies for the project. Some of the elements implemented included low-flow plumbing and motion light sensors throughout reducing water usage and creating energy savings. 

Because the project was located on such a large site, the team chose specific indigenous plants and grasses in the landscape that didn’t require irrigation; thus saving water usage. Other areas that increased the project’s performance included that fact it was developed on a Brownfield site; which enabled the use of a site which in the past would have been overlooked. Through shared parking with the adjacent City of Delray Swimming Complex the Project Team minimized adding parking spaces which helps to reduce the island heat effect created from asphalted parking areas.

The project team determined they would ensure the use of regional materials for the project as well as taking advantage of programs such as Renewable Energy Credits and Certified Woods. As a method to prevent increasing wasted materials, the old asphalt that was demolished was re-used.  During the demolition, instead of sending the crushed asphalt to the landfill, they worked with Waste Management to repurpose for base course to stabilize the new parking lots. +

Related Stories

| Jul 3, 2012

TOLK now called Dewberry

The renaming indicates a simplification in Dewberry’s corporate naming conventions.

| Jul 2, 2012

Bernards building mixed-use project in Beverly Hills

The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.

| Jul 2, 2012

San Francisco lays claim to the greenest building in North America

The 13-floor building can hold around 900 people, but consumes 60% less water and 32% less energy than most buildings of its kind.

| Jun 29, 2012

SOM writes a new chapter at Cincinnati’s The Christ Hospital

The 332,000–sf design draws on the predominantly red brick character of The Christ Hospital’s existing buildings, interpreting it in a fresh and contemporary manner that fits well within the historic Mt. Auburn neighborhood while reflecting the institution’s dedication to experience, efficiency, flexibility, innovation and brand.

| Jun 29, 2012

Benjamin Moore Paints announces new CEO

Robert S. Merritt comes to Benjamin Moore with over three decades of management experience in the restaurant and food preparation and distribution industries

| Jun 29, 2012

Guardian launches industry’s first glass visualizer for interior design

Online tool allows designers to explore the possibilities of glass.

| Jun 28, 2012

Federal applications of renewable energy

U.S. Army Fort Knox: Using the Earth for space heating and cooling. The U.S. Department of Energy’s (DOE) Federal Energy Management Program (FEMP) facilitates the Federal Government’s implementation of sound, cost-effective energy management and investment practices to enhance the nation’s energy security and environmental stewardship.

| Jun 27, 2012

HDR opens office in Beijing

The Beijing office is HDR’s second location in China; the firm’s other office is in Shanghai.

| Jun 27, 2012

KBE Building wins honor for Armed Forces Reserve Center

The construction phase was completed in just 16 months.

| Jun 27, 2012

SOM’s Baker receives honorary doctorate in engineering from Heriot-Watt University

Baker recognized for his career and influential contribution in the field of structural engineering.

boombox1
boombox2
native1

More In Category


Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.


Cultural Facilities

Baltimore’s National Aquarium opens 10,000-sf floating wetland that mimics the harbor’s original tidal marsh habitat

The National Aquarium in Baltimore has opened the National Aquarium Harbor Wetland, a 10,000-sf floating wetland that mimics the Inner Harbor’s original Chesapeake Bay tidal marsh habitat. Located between Piers 3 and 4 on Baltimore’s Inner Harbor, the $14 million project features more than 32,000 native shrubs and marsh grasses. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â