flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Plumosa School of the Arts earns LEED Gold

Plumosa School of the Arts earns LEED Gold

Education project dedicated to teaching sustainability in the classroom.


By Posted by Tim Gregorski, Senior Editor | July 2, 2012
Plumosa School of the Arts has been awarded LEED Gold by the USGBC.
Plumosa School of the Arts has been awarded LEED Gold by the USGBC.

Suffolk Construction announced that Plumosa School of the Arts has been awarded LEED Gold by the USGBC. 

Plumosa, located in Delray Beach, is one of the first elementary schools in South Florida with a dedicated curriculum for the Arts. The project built for the School District of Palm Beach County, included the renovation and addition to the existing Atlantic High School campus. The new 92,000-sf 704-station elementary school included extensive modernization and preservation planning of the 640-seat auditorium.

During the project planning and design stages, the School District had mandated all projects moving forward would be required to apply for LEED Silver. Suffolk Construction, along with the design team of Tercilla Courtemanche Architects, reviewed the project and the traditional USGBC point system for opportunities to create sustainable strategies for the project. Some of the elements implemented included low-flow plumbing and motion light sensors throughout reducing water usage and creating energy savings. 

Because the project was located on such a large site, the team chose specific indigenous plants and grasses in the landscape that didn’t require irrigation; thus saving water usage. Other areas that increased the project’s performance included that fact it was developed on a Brownfield site; which enabled the use of a site which in the past would have been overlooked. Through shared parking with the adjacent City of Delray Swimming Complex the Project Team minimized adding parking spaces which helps to reduce the island heat effect created from asphalted parking areas.

The project team determined they would ensure the use of regional materials for the project as well as taking advantage of programs such as Renewable Energy Credits and Certified Woods. As a method to prevent increasing wasted materials, the old asphalt that was demolished was re-used.  During the demolition, instead of sending the crushed asphalt to the landfill, they worked with Waste Management to repurpose for base course to stabilize the new parking lots. +

Related Stories

Architects | Mar 20, 2016

Ars Gratia Artis: A North Carolina architect emphasizes the value of art in its designs

Turan Duda says clients are receptive, but the art must still be integral to the building’s overall vision.

Architects | Mar 16, 2016

PGAL acquires Dallas-based Pro Forma Architecture

The merger adds a firm that has specialized in municipal projects.

Events Facilities | Mar 15, 2016

Bjarke Ingels, Foster+Partners, and Grimshaw all winners in Expo 2020 pavilion design competition

BIG designed the Opportunity Pavilion, Foster+Partners submitted the winning Mobility Pavilion, and Grimshaw created the Sustainability Pavilion.

Sports and Recreational Facilities | Mar 14, 2016

Washington Redskins tease new stadium model designed by Bjarke Ingels

The location isn't yet determined, but the new stadium will have a moat for kayaking.

Architects | Mar 11, 2016

German artist recreates Brutalist buildings with LEGO blocks

Arndt Schlaudraff brings the beauty out of the rugged, linear style of buildings most popular a half century ago.

Architects | Mar 11, 2016

Architecture for Humanity rebrands itself as Open Architecture Collaborative

With a new name, logo, and mission, the Open Architecture Collaborative is seeking a fresh start. 

Architects | Mar 11, 2016

AIA survey finds many women and minority architects still feeling underrepresented and unfulfilled

Dissatisfaction with “work-life balance” and compensation are cited as reasons why companies’ diversity strategies may be faltering.

University Buildings | Mar 11, 2016

How architects can help community colleges promote community on campus

Even in the face of funding challenges and historic precedent, there are emerging examples of how partnership between two-year academic institutions and designers can further elevate community on campus. CannonDesign's Carisima Koenig has a few key examples.

Architects | Mar 10, 2016

Value engineering: How to manage the process and limit the risk of VE

AEC consultant Steve Whitehorn shares several ways in which architects can be more effective managers of value-engineered change.

Architects | Mar 9, 2016

Two Houston firms merge to form Method Architecture

In mid-2016, Architects-Plus and Three Square Design Group will join to make a studio that will design industrial centers, corporate interiors, breweries, and more.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021