The Plumbing Efficiency Research Coalition is set to begin its long-anticipated Drainline Transport in Buildings study. The effort is aimed at determining if decreasing levels of water flow––caused by increasingly efficient plumbing fixtures––are sufficient to clear debris from plumbing pipes.
Essentially, plumbing experts have expressed concerns that the industry has reached a tipping point in terms of the ability of low-flow fixtures to adequately transport waste through drain lines, particularly in larger commercial systems with long horizontal runs to the sewer. Soon, they worry, end-users and professionals will avoid using more efficient products.
That, combined with the fact that such problems have been reported with low-flow plumbing systems in Europe and Australia, has raised many questions.
“I look forward to the results of the Drainline Transport study,” says David C. Smith, PE, plumbing and fire protection department manager, Bala Consulting Engineers, King of Prussia, Pa. “Logic states that less water in the waste stream will not carry the waste as far in the drainage piping.”
By analyzing the drainage issue from a standpoint of slope, flush volume, toilet design, and whether periodic surges of water into a building drain can help, researchers hope to come away with a more informed understanding of the issue.
David E. DeBord, CPD, LEED BD+C, ARCSA-AP, a Chicago-based plumbing and fire protection engineer, wonders if ultimately the industry will need to reduce the size of piping to maintain the minimum velocities required to assure proper scouring, and whether a 1/8-inch minimum pitch per foot of piping is still sufficient in this new world of low-flow plumbing systems.
PERC’s coalition members include the International Association of Plumbing & Mechanical Officials (IAPMO), Alliance for Water Efficiency (AWE), the American Society of Plumbing Engineers (ASPE), the International Code Council (ICC), Plumbing-Heating-Cooling Contractors (PHCC), and Plumbing Manufacturers International (PMI). The group’s impending research is scheduled to be conducted at an American Standard testing facility. +
Related Stories
| May 1, 2012
Gilbane to build $100 million cranberries manufacturing facility
Gilbane to provide design build services for a new Lean manufacturing facility for Ocean Spray Cranberries Inc., beverage products.
| May 1, 2012
Construction is underway on MLK ambulatory care center in L.A.
Featuring a variety of sustainable features, the new facility is designed to achieve LEED Gold Certification.
| Apr 30, 2012
Virginia Commonwealth unveils design for Arts Institution
Institute for Contemporary Art will serve as a catalyst for exhibitions, programs, research and collaboration.
| Apr 30, 2012
Summit Design + Build completes build-out for Office Concepts
The project is seeking LEED ID Silver certification from the U.S. Green Building Council.
| Apr 30, 2012
HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project
HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.
| Apr 30, 2012
Gilbane to manage retrofit of the Fraunhofer CSE R&B structure
Building is a first-of-its-kind research and demonstration building for sustainable technologies in Boston's Innovation District.
| Apr 30, 2012
KBE Building completes renovation at the ConnCAT
The $1.2 million project consisted of a 16,000-sf interior renovation.
| Apr 27, 2012
GreenExpo365.com to offer webinars on EPA’s WaterSense Program
Architects and builders interested in developing water-efficient buildings invited to attend free sessions featuring experts discussing water-efficient building practices.
| Apr 27, 2012
APA launches wood design web portal for building and design pros
Design professionals who are members of APA’s Professional Associates are automatically enrolled in the APA Designers Circle program.
| Apr 27, 2012
China Mobile selects Leo A Daly to design three buildings at its new HQ
LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.