The Plumbing Efficiency Research Coalition is set to begin its long-anticipated Drainline Transport in Buildings study. The effort is aimed at determining if decreasing levels of water flow––caused by increasingly efficient plumbing fixtures––are sufficient to clear debris from plumbing pipes.
Essentially, plumbing experts have expressed concerns that the industry has reached a tipping point in terms of the ability of low-flow fixtures to adequately transport waste through drain lines, particularly in larger commercial systems with long horizontal runs to the sewer. Soon, they worry, end-users and professionals will avoid using more efficient products.
That, combined with the fact that such problems have been reported with low-flow plumbing systems in Europe and Australia, has raised many questions.
“I look forward to the results of the Drainline Transport study,” says David C. Smith, PE, plumbing and fire protection department manager, Bala Consulting Engineers, King of Prussia, Pa. “Logic states that less water in the waste stream will not carry the waste as far in the drainage piping.”
By analyzing the drainage issue from a standpoint of slope, flush volume, toilet design, and whether periodic surges of water into a building drain can help, researchers hope to come away with a more informed understanding of the issue.
David E. DeBord, CPD, LEED BD+C, ARCSA-AP, a Chicago-based plumbing and fire protection engineer, wonders if ultimately the industry will need to reduce the size of piping to maintain the minimum velocities required to assure proper scouring, and whether a 1/8-inch minimum pitch per foot of piping is still sufficient in this new world of low-flow plumbing systems.
PERC’s coalition members include the International Association of Plumbing & Mechanical Officials (IAPMO), Alliance for Water Efficiency (AWE), the American Society of Plumbing Engineers (ASPE), the International Code Council (ICC), Plumbing-Heating-Cooling Contractors (PHCC), and Plumbing Manufacturers International (PMI). The group’s impending research is scheduled to be conducted at an American Standard testing facility. +
Related Stories
| Aug 9, 2012
Slideshow: New renderings of 1 WTC
Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.
| Aug 9, 2012
DSGW Architects welcomes new employees
Three new employees located in DSGW's Duluth office.
| Aug 9, 2012
DMR Architects converts bank building to municipal court
The project consisted of a $4 million renovation to a 2-story building totaling 13,000-sf.
| Aug 8, 2012
BD+C wins six B2B journalism awards
BD+C wins two national awards, three regional awards, and a regional Graphical Excellence award.
| Aug 8, 2012
BIM’s future up in the cloud
The AEC industry is on the cusp of a still more significant evolution with cloud computing.
| Aug 8, 2012
Giants 300 Sports Facilities Report
BD+C's Giants 300 Top 25 AEC Firms in the Sports Facilities sector.
| Aug 8, 2012
Giants 300 Science & Technology Report
BD+C's Giants 300 Top 25 AEC Firms in the Science & Technology sector.
| Aug 7, 2012
Pioneering revival
Financial setbacks didn’t stop this Building Team from transforming the country’s first women’s medical school into a new home for college students.
| Aug 7, 2012
Shedding light on the arts
Renovating Pietro Belluschi’s Juilliard School opens the once-cloistered institution to its Upper West Side community.
| Aug 7, 2012
How to win more state and local government projects
With a huge building stock at their disposal, state and local governments can be attractive clients, especially in these difficult economic times.