flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Plant Prefab and Brooks + Scarpa design scalable, multifamily kit-of-parts

Multifamily Housing

Plant Prefab and Brooks + Scarpa design scalable, multifamily kit-of-parts

It is Plant Prefab’s first multifamily system.


By David Malone, Associate Editor | October 7, 2019
Nest LivingHomes concept

Renderings courtesy Plant Prefab

The Nest LivingHomes toolkit is a scalable, multifamily housing solution from Plant Prefab and Brooks + Scarpa that is adaptable to a variety of different urban lot conditions and housing program needs.

LivingHomes units are constructed in Plant’s custom homebuilding factory in Rialto, Calif., which cuts the construction timeline in half and significantly reduces building costs. The Nest concept is based on the Plant Building System, Plant’s patented, component-based construction platform.

 

Nest Livinghomes kit of parts

 

Nest LivingHomes offer developers and affordable housing organizations a flexible solution they can use for smaller, urban infill lots in order to build affordable housing faster and for a lower cost than site-based approaches.

 

See Also: LEO A DALY wins Architect of the Capitol contract

 

A driving force behind the concept was that housing for the homeless should be scattered throughout a region and not just concentrated in one community. A main goal was to give homeless people a sense of dignity and shared social spaces on underutilized parcels of land.

 

Nest LivingHomes concept

 

“As the demand and cost for housing continues to rise, Nest was conceived to provide a scalable, cost-effective, high-quality solution to multifamily housing,” said Angie Brooks, Managing Principal, brooks + Scarpa, in a release. “Like the nesting habits of birds, the toolkit is based on the different ways people live with the objective of giving everyone an affordable place to live.”

Related Stories

Coronavirus | Jan 20, 2022

Advances and challenges in improving indoor air quality in commercial buildings

Michael Dreidger, CEO of IAQ tech startup Airsset speaks with BD+C's John Caulfield about how building owners and property managers can improve their buildings' air quality.

3D Printing | Jan 12, 2022

Using 3D-printed molds to create unitized window forms

COOKFOX designer Pam Campbell and Gate Precast's Mo Wright discuss the use of 3D-printed molds from Oak Ridge National Lab to create unitized window panels for One South First, a residential-commercial high-rise in Brooklyn, N.Y.

Multifamily Housing | Jan 12, 2022

Nabr, co-founded by Bjarke Ingels, looks to reimagine the future of urban living

The company’s first development is slated to break ground in summer 2022.

Multifamily Housing | Jan 12, 2022

Construction begins on downtown Phoenix’s PALMtower

The multifamily tower will rise 28-stories.

ProConnect Events | Jan 8, 2022

ProConnect Events 2022: Multifamily, Sustainability, Education, and Single Family – watch the video to learn how to participate!

At ProConnect events, building product manufacturers meet with AEC professionals and real estate developers to discuss upcoming building projects, new products, and technical solutions.

Senior Living Design | Jan 5, 2022

Top Senior Living Facility Design and Construction Firms

Perkins Eastman, Kimley-Horn, WSP USA, Whiting-Turner Contracting Co., and Ryan Companies US top BD+C's rankings of the nation's largest senior living sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.

Multifamily Housing | Dec 22, 2021

This will be Fort Lauderdale’s Tallest Building

ODA is designing the project.

Multifamily Housing | Nov 29, 2021

Arthaus residential units and community art gallery debut in Allston, Mass.

PCA-designed residential community includes 74 apartments, 9 condos by The Mount Vernon Company.

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021