flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Plainfield, Ill., recreation center projected to achieve the Passive House Institute US PHIUS+ Source Zero certification

Sports and Recreational Facilities

Plainfield, Ill., recreation center projected to achieve the Passive House Institute US PHIUS+ Source Zero certification

Design-build firm Wight & Company completed the building.


By David Malone, Associate Editor | May 9, 2019

All photos: Kmiecik Imagery

The recently completed Prairie Activity and Recreation Center (PARC) in Plainfield, Ill., is projected to be the first building of its kind to achieve the Passive House Institute US PHIUS+ Source Zero certification.

Designed as a net zero facility, the two-story, 37,000-sf building features a 4,000-sf fitness center and studio with a full-size basketball court, an elevated 10-lap walking track, a 1,600-sf multi-purpose room for classes and special events, and a preschool suite. The preschool suite includes a dedicated reception area and entrance and four classrooms with high windows and “look nooks” (low picture windows that connect the children to the natural surroundings outside).

 

 

The PARC is 65% more efficient than a conventional commercial building of the same size in a similar climate. It includes a 28,600-sf solar array and a highly insulating building envelope. A Building Performance monitor at the front entry will share building energy use and solar energy production information with visitors.

Exterior building features include LED site lighting, rain gardens, native landscaping, parking for 110 vehicles, a recreation patio for the preschool, and walking trails. The PARC is the newest addition to the Bott Park complex, which includes a playground, ball fields, and soccer fields.

 

 

 

 

Related Stories

| Sep 24, 2012

$3.8-million athletic field and track opens in Glen Head, N.Y.

The complex also includes a new, one-story, multi-purpose building that serves as the main entry port to the athletic facilities.

| Sep 7, 2012

Duffy joins Thornton Tomasetti

At Hardesty & Hanover, Duffy partnered with Thornton Tomasetti on a number of projects.

| Aug 24, 2012

Meis heads to Woods Bagot Sport

Staples Center, Paul Brown Stadium architect to leverage global studio to serve clients worldwide.

| Aug 8, 2012

Giants 300 Sports Facilities Report

BD+C's Giants 300 Top 25 AEC Firms in the Sports Facilities sector.

| Jun 14, 2012

Minnesota Vikings stadium plan gets legislative go-ahead

Legislation that approved the construction of a new billion dollar stadium for the Minnesota Vikings passed the Minnesota legislature.

| Jun 8, 2012

Chestnut Hill College dedicates Jack and Rosemary Murphy Gulati complex

Casaccio Yu Architects designed the 11,300-sf fitness and social complex.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 30, 2012

Hill International to manage construction of Al Risafa Stadium in Iraq

The three-year contract has an estimated value to Hill of approximately $3.3 million.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1
boombox2
native1

More In Category




Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021